Laserfiche WebLink
Biosolids Handling Cost Estimate <br />Pump to Great River Energy <br />ItemCost <br />Site Work/Site Piping$150,000 <br />Pumps$125,000 <br />Sludge Storage Aeration Equipment$175,000 <br />Electrical/Controls$90,000 <br />Total Construction Cost <br />$540,000 <br />Contingency (10 %)$54,000 <br />Engineering/Admin (15%)$81,000 <br />Total Project Cost$675,000 <br />21 <br />