My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Biosolids Handling Cost Estimate <br />Pump to Great River Energy <br />ItemCost <br />Site Work/Site Piping$150,000 <br />Pumps$125,000 <br />Sludge Storage Aeration Equipment$175,000 <br />Electrical/Controls$90,000 <br />Total Construction Cost <br />$540,000 <br />Contingency (10 %)$54,000 <br />Engineering/Admin (15%)$81,000 <br />Total Project Cost$675,000 <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.