My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Biosolids Handling Cost Estimate <br />Heat Drying <br />ItemCost <br />Mobilization$300,000 <br />Site Work$200,000 <br />Site Piping$100,000 <br />Building (12,000 sq ft)$1,560,000 <br />Polymer Feed System$50,000 <br />Pumps/Piping$150,000 <br />Dewatering Equipment$600,000 <br />Sludge Storage Aeration Equipment$150,000 <br />Heat Drying Equipment$4,000,000 <br />Conveying Systems$50,000 <br />Odor Control System$150,000 <br />Mechanical$750,000 <br />Electrical/Controls$800,000 <br />Total Construction Cost <br />$8,860,000 <br />Contingency (10 %)$886,000 <br />Engineering/Admin (15%)$1,329,000 <br />Total Project Cost$11,075,000 <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.