Laserfiche WebLink
Biosolids Handling Cost Estimate <br />Heat Drying <br />ItemCost <br />Mobilization$300,000 <br />Site Work$200,000 <br />Site Piping$100,000 <br />Building (12,000 sq ft)$1,560,000 <br />Polymer Feed System$50,000 <br />Pumps/Piping$150,000 <br />Dewatering Equipment$600,000 <br />Sludge Storage Aeration Equipment$150,000 <br />Heat Drying Equipment$4,000,000 <br />Conveying Systems$50,000 <br />Odor Control System$150,000 <br />Mechanical$750,000 <br />Electrical/Controls$800,000 <br />Total Construction Cost <br />$8,860,000 <br />Contingency (10 %)$886,000 <br />Engineering/Admin (15%)$1,329,000 <br />Total Project Cost$11,075,000 <br />20 <br />