Laserfiche WebLink
~:?. ~T <br />fiver <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />~11a~-18, 2012 <br />Carl Helton <br />~utozone <br />123 S. Front Street <br />Memphis, TN 38103 <br />RE: Proposed AutoZone development at 18278 Zane Street <br />Dear hIY. Helton: <br />rat the Site Plan Review Committee meeting on ~Ia~= 9~', staff reviewed your application and <br />has the following comments: <br />Timetable <br />1) This project will require a public hearing of the site plan. These hearings are anticipated <br />for June 12`h, 2012 (Planning Commission) and June 18`h (City Council). Both meetings start <br />at 6:30 and axe held at the Elk Rig=er City Hall. You or an agent must attend these meetings. <br />Building Inspections <br />2) Site Plan approval merely gives the City= the ability= to issue a building permit. Please <br />correspond with Bob Ruprecht, Building Official for the building permit. He can be reached <br />at 763/ 635-1066. <br />Engineering <br />3) The City engineer has reviewed the drawings and has suggested the following changes, <br />based on the sheet: <br />Page C3 -Storm Manhole #1 shall be detailed and constructed per Elk River <br />Standard Plate # 4001. <br />Page C3 -Revise grading or add a drainage structure to prevent drainage leaving the <br />site at the SE corner of the project. <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br />www.ci.elk-river.mn.us <br />