My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 PCSR 06-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
06-12-2012
>
4.5 PCSR 06-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 11:15:37 AM
Creation date
6/7/2012 2:27:50 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: SP 12-02 <br />Page 3 <br />AutoZone Site Plan <br />Storm Sewer/water -Storm water will be collected on site and distributed to the storm ponds on <br />the east side of Zane Street as original proposed for the development. <br />Landscaping <br />Lot Trees - 32 trees are required based on the lot size, with the following ratio: 16 over story, 8 <br />evergreen, and 8 ornamental. While the landscaping plan was adjusted in part based on comments <br />staff provided, the site plan is short 6 evergreen trees and two over story trees. Staff suggests a <br />condition to address this. <br />Street Trees -The applicant shows 4 trees along Zane, continuing the pattern established with the <br />previous developments. <br />Other <br />Lighting <br />The zoning code requires a minimum level of 3 footcandles. That has been interpreted to read 3 fc <br />average. The photometric plan: shows an average footcandle reading of 1.3 over the entire; site, <br />including the northern third that is not developed. Lighting is provided by 7 wall packs mounted to <br />the building. and 7 fixtures mounted to poles. The poles are 25 feet high. It appears the lighting <br />plan will need to be adjusted to comply with the lighting requirements. A condition to that effect is <br />provided.. <br />Si--- <br />The Elk River Grossing-PUD outlines specific requirements for signage, allowing up to two wall <br />signs '(max size. of 7°/a of the wall area on which the sign is placed) <br />While the sign will be issued under separate permits, it is important to understand the allowances: <br />.Rear: 140.39 square feet <br />Front: 146.64 square feet <br />The signs on the building have not been verified for consistency with the agreement. <br />The applicant proposes afree-standing sign in the southeast corner of the site, north of the drive. <br />This sign too, will be issued under a separate permit; however, there are specific materials required <br />for the base, specifically brick. The plans as shown indicate a stucco textured aluminum pole .cover. <br />All signage will need to meet the PUD agreement requirements. A condition to that effect is <br />recommended. <br />Dumpster <br />A dumpster enclosure is shown as a treated pine enclosure on the west side of the building, most <br />visible from Highway 169. The PUD agreement states that "trash compactors and enclosures shall <br />be within an enclosure constructed of the same materials and colors as those used in the building." <br />The dumpster enclosure will need to be modified. <br />N:\Departments\Community Development\Planning\Case Files\SP\SP 12-02 AutoZone\SP 12-02 Autozone SR to PC 6-12-12.doc~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.