Laserfiche WebLink
We also would like to look more closely at monthly connection fees to bring the fees in line with <br /> the General and Administrative Overhead expenses so they are on parity, and to gradually <br /> eliminate the Senior Rate. This way usage rates are covering annual operating expenses, and <br /> monthly connection fees are covering the overhead (as they should) without any class subsidizing <br /> another(as they shouldn't.) <br /> Working with the direction of a 2.5% increase, we applied the 2.5% to the base revenue <br /> calculation to arrive at the target revenue increase of$2,041,234. Then focusing on the first tier <br /> usage rates and the monthly connection fees, it is a 4% increase needed to reach the target <br /> revenue. Additionally, with the next four years having capital projects of over $1 million each <br /> year, a preliminary 3 year rate projection of 4% each year would be necessary to keep target <br /> reserves in place. The assumptions used for this analysis and graph pictorial are included to help <br /> understand the budget needs. <br /> Proposed 2013 water rates are as attached on the water rate worksheet. <br /> Notable items in the water budget for 2013 are(again): <br /> • Zone water pressure improvement project $40,000 is included in the expense, and an <br /> offsetting reimbursement from the trunk fund is included in the income <br /> • Water Tower Lease income is increased $23,000 for 2013 for additional equipment on one <br /> tower <br /> • Maintenance of Structures includes roof repairs for well houses <br /> • Pumping and Distribution expenses are increased for additional staff and related work that <br /> was under-budgeted in 2012 <br /> • Customer Service expenses increased to include CRC after hours call services, online billing <br /> through online payment portal, increased credit card usage <br /> • Proposed staff addition for Executive Assistant <br /> • Ipads for commission meetings <br /> • Approximate$7,000 per year increase in LMC insurance costs due to recent land use claim <br /> for the City of Elk River **new since November meeting** <br /> ACTION REQUESTED: <br /> Staff recommends approval of the 2013 budget and rates. <br /> ATTACHMENTS: <br /> • Proposed Summary of 2013 Budgets <br /> • Proposed 2013 Electric Revenue and Expense Budget <br /> • Proposed 2013 Water Revenue and Expense Budget <br /> • ERMU Water Rate Worksheet <br /> • ERMU Water Utilities Cash Reserves Graph <br /> • Proposed 2013 Electric Capital Budget <br /> • Proposed 2013 Administration and Technical Services Capital Budgets <br /> • Proposed 2013 Water Capital Budgets <br /> • Proposed 2013 Training and Travel Budget <br /> • Proposed 2013 Conservation Improvement Program Budget <br /> vorteto or <br /> SRS M1 Page 3 of 3 INATUR <br /> Reliable Public <br /> Power Provider POWERED To SERVE <br />