Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Troy Adams, P.E. —General Manager <br /> John Dietz—Chair <br /> Daryl Thompson— Vice Chair <br /> Al Nadeau—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 12, 2012 4.2 <br /> SUBJECT: <br /> 2013 Budget <br /> BACKGROUND: <br /> In November, the Commission reviewed the 2013 budget. The Commission had a number of issues <br /> with the budget as presented. Direction on water rates indicated that 5% was too much of an increase <br /> in one year and stated a target of 2.5% for 2013 increase. There were questions on the customer <br /> accounts expense and what was included, there was discussion on out of state travel and proposed <br /> staff additions. The budget currently reflects a 3% Cost of Living Adjustment (COLA). No decision <br /> on COLA was made by the Commission at the November meeting. <br /> DISCUSSION: <br /> Electric Department Expense Budget <br /> As mentioned before, wholesale power costs makes up approximately 74% of the required <br /> operating revenue and the wholesale rates set by Great River Energy (GRE) have an enormous <br /> impact on ERMU's rates. The 2013 wholesale power rates have been finalized and are the same <br /> as preliminary rates presented. This results in a 4.1% increase in wholesale power cost to ERMU, <br /> and a 4.4% increase in ERMU revenue to cover the budgeted expenses. <br /> Notable items in the electric budget for 2013 are(again): <br /> • $0 Generation Credit for income with the elimination of the standby engines agreement <br /> with GRE <br /> • Continued current efficiency with the LFG plant in terms of higher production and lower <br /> maintenance <br /> • New starting 2013 - SCADA expenses, estimate $8,000; radio licensing cost($75 per <br /> radio) $3,000 included in Distribution Expense <br /> • Maintenance reduction in meters as change-outs completed, and shifted to underground <br /> services <br /> • Mapping included $20,000 to include outside help for specialized areas <br /> Jr r <br /> oERED IE <br /> Page 1 of 3 NATURE <br /> Reliable Public <br /> Power Provider POWERED To SERVE <br />