My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 01-07-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
01-07-2013
>
9.1. SR 01-07-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2013 8:47:10 AM
Creation date
1/4/2013 8:26:48 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/7/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. STREET AND UTILITY IMPROVEMENT PROJECT <br /> 2.1 Introduction <br /> 2.1.1 Authorization <br /> On October 15, 2012, the Elk River City Council authorized the preparation of an <br /> engineering feasibility report for the 2013 Street Improvement Project. <br /> 2.1.2 Scope <br /> The 2013 Street Improvement Project includes bituminous wear course improvements to <br /> past incomplete roadway projects, edge mill and full width overlay improvements, full <br /> depth reclamation improvements, and full street reconstruction improvements. Utility <br /> infrastructure repairs and replacements are also proposed to be completed in conjunction <br /> with the various surface improvements. <br /> 2.1.3 Data Available <br /> Information and materials used in the preparation of this report include the following: <br /> • City of Elk River Record Plans <br /> • City of Elk River Topography Maps <br /> • City of Elk River Pavement Management Program <br /> • Discussions with City Staff <br /> • Field Observations of the Area <br /> • Bituminous Coring Logs and Pavement Core Report,WSB & Associates, Inc., <br /> dated December 4, 2012 <br /> • Geotechnical Evaluation Report, American Engineering Testing, dated December, <br /> 2012 <br /> 2.2 General Background <br /> 2.2.1 Project Location <br /> The streets and neighborhoods proposed for improvements include: <br /> Bituminous Wear Course Paving <br /> • Eagle Marsh <br /> • Hillside Estates <br /> • K& L Addition <br /> • The Woods at Hillside <br /> Feasibility Report <br /> 2013 Street Improvement Project <br /> City of Elk River,MN <br /> WSB Project No.1992-01 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.