Laserfiche WebLink
City Council Minutes Page 6 <br /> November 19,2012 <br /> • OVERALL SITE PLAN DATED OCTOBER 25,2012, SHEET Al. <br /> • OVERALL FLOOR PLAN DATED OCTOBER 25,2012, SHEET A2. • <br /> • LANDSCAPING PLAN DATED SEPTEMBER 20,2012, SHEET 1 AND 2. <br /> AND SUBJECT TO THE FOLLOWING CONDITIONS: <br /> 1. AS A CONDITIONAL USE PERMIT IS NOT A BUILDING PERMIT,THE <br /> APPLICANT SHALL APPLY FOR ALL REQUIRED PERMITS. <br /> 2. THE DEVELOPMENT SHALL MEET ALL APPLICABLE FIRE CODES. <br /> THE FIRE CHIEF SHALL VERIFY THE LOCATION OF ALL FIRE <br /> HYDRANTS,AND MAY REQUIRE ADDITIONAL HYDRANTS <br /> NECESSARY TO PRESERVE HEALTH AND SAFETY. <br /> 3. LANDSCAPING PLAN ILLUSTRATED ON PLANS DATED SEPTEMBER <br /> 20,2012. <br /> 4. THE SIGN PACKAGE IS NOT APPROVED. <br /> 5. THE PLAT SHALL BE RECORDED AND FEES PAID PRIOR TO <br /> RELEASE OF THE BUILDING PERMIT. <br /> 6. CORNERSTONE TO PLACE$10,000 IN ESCROW AS GUARANTEE OF <br /> THE LANDSCAPING IMPROVEMENTS. DUE TO THE LATENESS OF <br /> THE YEAR,THE LANDSCAPING WAS NOT ABLE TO BE VERIFIED. <br /> THE ESCROW WOULD COMPEL THE APPLICANT TO COMPLETE ANY <br /> NECESSARY WORK. <br /> MOTION CARRIED 5-0. <br /> B. Preliminary and Final Plat:Jabez,Case No.P 12-04 <br /> MOVED BY COUNCILMEMBER WESTGAARD AND SECONDED BY <br /> COUNCILMEMBER GUMPHREY TO APPROVING THE PRELIMINARY <br /> PLAT AND ADOPTING RESOLUTION 12-65 GRANTING FINAL PLAT <br /> APPROVAL FOR CASE NO.P 12-04 AS ILLUSTRATED ON DRAWINGS DATE <br /> STAMPED SEPTEMBER 24,2012, SUBJECT TO THE FOLLOWING <br /> CONDITIONS: <br /> 1. ADDITIONAL RIGHT-OF-WAY OF ABOUT 16.22 FEET SHALL BE <br /> PROVIDED ALONG 171ST AVENUE AS SHOWN ON THE DRAWING. <br /> 2. THE PLAT SHALL PROVIDE ACCESS CONTROL ALONG HIGHWAY 10 <br /> FRONTAGE,PROHIBITING ACCESS. <br /> 3. THE DEVELOPMENT SHALL MEET ALL APPLICABLE FIRE CODES. <br /> THE FIRE CHIEF SHALL VERIFY THE LOCATION OF ALL FIRE <br /> HYDRANTS AND MAY REQUIRE ADDITIONAL HYDRANTS <br /> NECESSARY TO PRESERVE THE HEALTH AND SAFETY OF THE <br /> RESIDENTS. <br /> 4. A SURFACE WATER MANAGEMENT FEE FOR LOT 1 SHALL BE PAID <br /> AT THE TIME THE FINAL PLAT IS RELEASED FOR RECORDING <br /> (CURRENTLY$1,214 PER ACRE OR$21,524.22 TOTAL). SURFACE WATER <br /> MANAGEMENT FEE FOR OUTLOTS A AND B SHALL BE PAID AT THE <br /> TIME THOSE LOTS ARE RELEASED FOR RECORDING AT THE RATE <br /> ESTABLISHED AT THAT TIME. <br /> 5. A PARK DEDICATION FEE SHALL BE PAID FOR 8.05 ACRES AT THE <br /> TIME THE FINAL PLAT IS RELEASED FOR RECORDING(CURRENTLY • <br /> $7,444 PER ACRE,OR$59,924.20 TOTAL). PARK DEDICATION FOR <br />