My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 PCSR 11-13-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
11-13-2012
>
4.4 PCSR 11-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2012 2:27:49 PM
Creation date
11/8/2012 1:31:46 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
11/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />G. Sheet 9 of 13 Utility Plan <br /> <br />. The plan shows a connection to the existing watermain in the rn 10 ditch and an <br />extension along the north side of the building providing two hydrants on this side as <br />required by the Fire Department. <br />. Label adjustments to sanitary sewer manhole tops. <br />. Sanitary sewer service is shown to be provided by constructing a manhole over the <br />existing sanitary sewer line. According to City ordinance, sewer services cannot be <br />connected to manholes. Therefore, the service connection must be provided by <br />cutting a six-inch wye into the existing sanitary sewer line. A manhole will be needed <br />along the length of the service line for two purposes. One, a sampling manhole is <br />required by City ordinance; and two, all services over 100 feet in length (this is one is <br />almost 200 feet) require a cleanout at the loa-foot points. <br />. No slope is provided for the sewer service line. This sewer service line must follow <br />building/plumbing codes for slope and cleanouts. <br /> <br />H. Sheet 10 of 13 Utility Plan <br /> <br />. A second connection to the existing watermain in the rn 10 ditch is provided on the <br />south side of the building. Water is then extended into the site providing for the <br />water service for the main building and an additional hydrant at the southeast corner <br />of the main building, and an additional hydrant located near the car wash/detail <br />center. This same line provides the water service to the car wash/detail center. <br />. The sanitary sewer service to the car wash/detail center is shown going into the <br />existing sanitary manhole. As indicated previously, services cannot be connected to <br />manholes. Therefore a wye must be cut into the existing line. Again, a sampling <br />manhole is required for the car wash/detail center service. <br />. Show adjustments to existing sanitary sewer manholes. <br /> <br />I. Sheet 13 of 13 Detail Sheet <br /> <br />. On the gate valve and box installation detail, add a nut extension. <br />. Delete the thrust blocking detail. City specifications require that all watermain joints <br />be retained with mega lugs. <br /> <br />J. Sheet 1 of 1 Preliminary Plat of J abez <br /> <br />. Provide additional right of way of approximately 16.5 feet along 171 st Avenue in the <br />area of the existing home. <br />. It is our understanding the owner of Elk River Ford will be closing the accesspdirectly onto 1H 10. Therefore, the plat should provide access control along the 1H <br />10 frontage. <br /> <br />S:\PLANNING\Case Files\2006\Plat\P 06-06 Jabez\04 03 06 engr memo. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.