The Public Works Facility Committee has reviewed the costs and advises holding the remodeling of the <br /> woodshop until later in the project if Contingency Budget would allow for it to be completed. This <br /> reduction in scope would result in a$40,000 savings. This change would reduce the building remodeling <br /> costs to $76,763 or $6,763 over the already included$70,000. If approved, the two project modifications <br /> would be deducted from the remaining contingency lowering the current balance to $93,032. We have <br /> reviewed this amount with RJM. RJM is comfortable that they can deliver the project on budget with the <br /> remaining contingency. <br /> ATTACHMENTS <br /> None <br /> Action Motion by Second by Vote <br /> Follow Up <br /> P'OWERID 9T <br /> 1`4AT' URE1 <br />