My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 10-01-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
10-01-2012
>
8.2. SR 10-01-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2012 9:04:52 AM
Creation date
9/28/2012 9:04:50 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/1/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Public Works Facility Committee has reviewed the costs and advises holding the remodeling of the <br /> woodshop until later in the project if Contingency Budget would allow for it to be completed. This <br /> reduction in scope would result in a$40,000 savings. This change would reduce the building remodeling <br /> costs to $76,763 or $6,763 over the already included$70,000. If approved, the two project modifications <br /> would be deducted from the remaining contingency lowering the current balance to $93,032. We have <br /> reviewed this amount with RJM. RJM is comfortable that they can deliver the project on budget with the <br /> remaining contingency. <br /> ATTACHMENTS <br /> None <br /> Action Motion by Second by Vote <br /> Follow Up <br /> P'OWERID 9T <br /> 1`4AT' URE1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.