My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. PCSR 09-11-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
09-11-2012
>
4.3. PCSR 09-11-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2012 9:34:24 AM
Creation date
9/7/2012 9:17:57 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File:CU 12-16 Spectrum High School CUP addition <br /> Page 3 <br /> The project will include the removal of spaces to accommodate the expansion,and the construction of a <br /> new parking lot into the soccer field. The new parking lot will include at least 38 parking spaces. <br /> Landscaping. The new parking lot will require landscaping improvements, to comply with recent changes <br /> to the City's landscaping regulations. <br /> The applicant has not noted any objections to these requirements, and a complete plan submittal will be <br /> available for the City Council meeting. These requirements were covered in the staff comment letter <br /> dated August 13th,2012. <br /> Staff did suggest that the parallel parking stalls be removed near the addition,as staff expects that to be <br /> prone to misuse:vehicles are likely to park head in,rather than parallel,into the fire code required 20 foot <br /> drive aisle. The applicant did not elect to pursue this recommendation as the encroachment into the <br /> soccer field would be too drastic,limiting their use of the field. Misuse of the parallel spaces may result in <br /> enforcement of the fire lane. <br /> Utilities <br /> The City engineer noted that there is a water main looped around the building. This water main may not <br /> be located within the confines of the building. <br /> ATTACHMENTS <br /> • Location Map <br /> • Memo from staff dated August 13,2012 <br /> • Applicant's Narrative <br /> • Site Plan dated July 30,2012 <br /> • Architectural Drawing dated July 30,2012 <br /> Action Motion by Second by Vote <br /> Follow Up <br /> N:\Departments\Community Development\Planning\Case Files\CUP\CU 12-16 Spectrum\CU 12-16 SR to PC Sprectrum Addition 9-11-12.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.