Laserfiche WebLink
ELK RIVER ICE ARENA - ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br />Summary of Ice System Replacement Options: <br />Table 4. Ice System Options - Cost Estimate Summary <br />1. See explanation in Section 2 of this report. <br />C Stevens 23 <br />Cost Estimate' <br />Item <br />Cost Per Ice System <br />Combined System <br />Option 3 <br />Option 4 <br />Option 5 <br />Option 6 <br />Option 7 <br />Option 7 <br />Conversion <br />New <br />New <br />New <br />Phase 1 <br />Phase 2 <br />Refrigerant type <br />Ex. R -22 <br />New HFC <br />Ammonia <br />CO2 <br />Ammonia <br />Ammonia <br />Grade of System <br />Industrial <br />Industrial <br />Industrial <br />Commercial <br />Industrial <br />Industrial <br />Removal & reinstall <br />$30,000 <br />$30,000 <br />$30,000 <br />$30,000 <br />$30,000 <br />$30,000 <br />existing dasher boards <br />Demolition of existing <br />$10,000 <br />$25,000 <br />$25,000 <br />$25,000 <br />$25,000 <br />$15,000 <br />refrigeration system <br />Demolition of existing <br />$60,000 <br />$60,000 <br />$60,000 <br />$60,000 <br />$20,000 <br />$60,000 <br />conc. ice rink floor <br />Replace mechanical <br />N/A <br />N/A <br />$25,000 <br />$25,000 <br />$30,000 <br />N/A <br />ventilation system <br />New exterior door and <br />N/A <br />N/A <br />$20,000 <br />$20,000 <br />N/A <br />N/A <br />concrete stoop <br />Repairs to Ex. System <br />$5,000 <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />(From Table 2) <br />Other repairs to existing <br />Not included <br />N/A <br />N/A <br />N/A <br />N/A <br />N/A <br />system (Table3) <br />See Table 3 <br />Expand refrigeration <br />$70,000 <br />$70,000 <br />$70,000 <br />$70,000 <br />N/A <br />N/A <br />room approx. 200 SF <br />New refrigeration <br />$225,000 <br />$475,000 <br />$575,000 <br />$725,000 <br />$775,000 <br />$180,000 <br />system or equipment <br />New concrete Ice rink <br />N/A <br />$350,000 <br />$350,000 <br />$475,000 <br />$420,000 <br />$338,000 <br />floor & subfloor <br />New snow melt pit heat <br />N/A <br />N/A <br />N/A <br />N/A <br />$75,000 <br />N/A <br />recovery system <br />Size of future <br />Additional heat reclaim <br />Not included <br />Not included <br />Not included <br />Not included <br />Not included <br />Not included <br />systems <br />See Table 3 <br />See Table 3 <br />See Table 3 <br />See Table 3 <br />See Table 3 <br />See Table 3 <br />Subtotal of estimated <br />$400,000 <br />$1,010,000 <br />$1,155,000 <br />$1,430,000 <br />$1,375,000 <br />$623,000 <br />construction costs <br />Estimate, design and <br />$60,000 <br />$151,500 <br />$173,000 <br />$214,500 <br />$206,300 <br />$93,500 <br />constr. Contingency <br />(15 %) 1 <br />Total estimated <br />$460,000 <br />$1,161,500 <br />$1,328,000 <br />$1,644,500 <br />$1,581,300 <br />$716,500 <br />construction costs <br />Engineering, legal, and <br />$55,200 <br />$139,500 <br />$159,400 <br />$197,500 <br />$189,800 <br />$86,000 <br />administrative (12 %)1 <br />Total estimated project <br />$515,200 <br />$1,301,000 <br />$1,487,400 <br />$1,842,000 <br />$1,771,100 <br />$802,500 <br />cost <br />Expected Useful Life - <br />15 -25 <br />25 -30 <br />25 -30 <br />TBD <br />25 -30 <br />25 -30 <br />Refrig System (yrs) <br />Expected Useful Life - <br />40 -50 <br />40 -50 <br />40 -50 <br />TBD <br />40 -50 <br />40 -50 <br />Rink Floor (yrs) <br />1. See explanation in Section 2 of this report. <br />C Stevens 23 <br />