My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 08-13-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
08-13-2012
>
6.3. SR 08-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2012 10:18:28 AM
Creation date
8/10/2012 9:10:00 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ICE ARENA — ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br />The one disadvantage of a common system is that if a major <br />problem occurs with the refrigeration system, both ice sheets <br />are down. However, most equipment and systems have <br />backups, minimizing the chance that a total system failure will <br />occu r. <br />A common ice system could be installed in phases as described <br />below: <br />Phase 1 includes the replaced of the existing ice rink floor and <br />refrigeration system in the Rink 2 since the existing refrigeration <br />room is likely large enough for the common system. At that <br />time the refrigeration system would be designed and installed <br />with the capacity and accommodations to connect to Rink 2 at <br />some point in the future. The existing ice rink floor in Rink 2 <br />would be replaced with a concrete rink floor of the same size. A <br />new mechanical ventilation system and refrigerant leak <br />detection system would be installed to meet code <br />requirements. <br />The R -22 refrigerant that is salvaged from Rink 2 can be used in <br />the refrigeration system for Rink 1 alleviating some concerns for <br />an R -22 shortage in the future. <br />Phase 2 includes installing the final compressor(s), pump(s), <br />piping and controls to serve Rink 1, replacing the existing ice <br />rink floor with a concrete rink floor, and change over the snow <br />melt system to use waste heat from the refrigeration system. <br />The cost estimates presented in the following table for Option 8 <br />are shown in two phases as described above and include the <br />complete replacement of both ice systems including <br />refrigeration systems and ice rink floors. <br />The cost estimates do not include the following items: <br />• Building a new refrigeration room for a common <br />refrigeration system to serve both rinks. <br />• Improvements to the Rink 2 refrigeration system to <br />keep it operating. <br />• Expanding the length of the ice rink floor in Rink 1 from <br />185' to 200'. This would require a building expansion. <br />• Reducing the size of the ice rink floor in Rink 2 from <br />Olympic to NHL size and expanding the bleachers. <br />Photo P -4: The City of Alexandria installed a <br />new industrial grade common refrigeration <br />system (for 2 rinks) in 2009 as discussed in <br />Option 7. The system currently operates <br />one ice rink but is designed to connect a <br />second ice rink in the future. <br />G Stevens 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.