Laserfiche WebLink
VP <br />CONSTRUCTION <br />ESTIMATE DATE: August 8, 2012 <br />PROJECT: Elk River Ice Arena - DRAFT 10 Year C.I.P Projection <br />ARCHITECT: 292 Design Group Equipment Only <br />DRAWING DATE: May 21, 2012 <br />Owner Costs <br />Zamboni <br />$240,000 <br />$240,000 <br />$240,000 <br />$240,000 <br />Batteries for Zamboni <br />$10,000 <br />$10,000 <br />$10,000 <br />$10,000 <br />Floor Scrubber <br />$9,500 <br />$9,500 <br />$9,500 <br />$9,500 <br />New Scoreboards <br />$19,500 <br />$19,500 <br />$19,500 <br />$19,500 <br />Miscellaneous <br />$25,000 <br />$25,000 <br />$25,000 <br />$25,000 <br />Owner Costs Subtotal <br />$304,000 <br />$304,000 <br />$304,000 <br />$304,000 <br />Inflation (3% /Year) <br />$91,200 <br />$91,200 <br />$91,200 <br />$91,200 <br />Total Owner Costs <br />$395,200 <br />$395,200 <br />$395,200 <br />$395,200 <br />Design Fees <br />Arch. /Engineering Design Fees <br />$336,851 <br />$262,231 <br />$2,839 <br />$0 <br />Design Fees Subtotal <br />$336,851 <br />$262,231 <br />$2,839 <br />$0 <br />Total Project Cost <br />$5,544,209 <br />$4,403,589 <br />$438,599 <br />$395,200 <br />PAGE 4OF4 <br />