Laserfiche WebLink
VP <br />CONSTRUCTION <br />ESTIMATE DATE: August 8, 2012 <br />PROJECT: Elk River Ice Arena - DRAFT 10 Year C.I.P Projection <br />ARCHITECT: 292 Design Group Construction Only <br />DRAWING DATE: May 21, 2012 <br />C.I.P. Outlay <br />Ten Year Projection <br />DESCRIPTION <br />Option 1 <br />"As Is" <br />Estimate <br />Option 2 <br />"Minimal" <br />Estimate <br />Option 3 <br />"Renovation" <br />Estimate <br />Option 4 <br />"New" <br />Estimate <br />Construction Costs <br />Replace Co- Ray -Vac Heating - Barn <br />$20,000 <br />$0 <br />$0 <br />$0 <br />Maintenance Storage Area <br />$75,000 <br />$0 <br />$0 <br />$0 <br />Replace Front Entry Doors <br />$12,000 <br />$0 <br />$0 <br />$0 <br />Heating System for Locker Rooms <br />$45,000 <br />$0 <br />$0 <br />$0 <br />Replace D.U. Unit in Barn <br />$275,000 <br />$0 <br />$0 <br />$0 <br />Membrane Roofing for Barn <br />$110,000 <br />$0 <br />$0 <br />$0 <br />Replace D.U. Wheel - Olympic <br />$80,000 <br />$0 <br />$0 <br />$0 <br />Paint Ceiling of Barn <br />$35,000 <br />$0 <br />$0 <br />$0 <br />Replace HVAC in Lobby <br />$15,000 <br />$0 <br />$0 <br />$0 <br />Expand Locker Room #5 <br />$8,500 <br />$0 <br />$0 <br />$0 <br />Electronic Air Monitor <br />$14,500 <br />$0 <br />$0 <br />$0 <br />HVAC Locker Rooms 5 -8 <br />$9,500 <br />$9,500 <br />$0 <br />$0 <br />Roof Repairs - Olympic Sheet <br />$22,320 <br />$22,320 <br />$0 <br />$0 <br />Crack Repairs at Precast <br />$16,200 <br />$16,200 <br />$16,200 <br />$0 <br />Roof Repairs - Miscellaneous <br />$3,840 <br />$3,840 <br />$0 <br />$0 <br />Replace Water Heaters <br />$7,200 <br />$7,200 <br />$0 <br />$0 <br />Replace Refrigeration System <br />$2,530,000 <br />$2,530,000 <br />$0 <br />$0 <br />Replace Dasher Boards <br />$140,000 <br />$140,000 <br />$0 <br />$0 <br />Exhaust System for MUA <br />$30,000 <br />$0 <br />$0 <br />$0 <br />Freon Detection System <br />$25,000 <br />$0 <br />$0 <br />$0 <br />Replace Rubber Flooring <br />$17,600 <br />$17,600 <br />$0 <br />$0 <br />Structural Repairs at Barn <br />$50,000 <br />$0 <br />$0 <br />$0 <br />Replace Co- Ray -Vac Htg - Olympic <br />$30,000 <br />$30,000 <br />$0 <br />$0 <br />Door Replacement <br />$50,000 <br />$25,000 <br />$15,000 <br />$0 <br />Toilet Room Repairs & Upgrades <br />$80,000 <br />$80,000 <br />$0 <br />$0 <br />Subtotal Construction Costs <br />$3,701,660 <br />$2,881,660 <br />$31,200 <br />$0 <br />Inflation (3% /year) <br />$1,110,498 <br />$864,498 <br />$9,360 <br />$0 <br />Total Construction Costs <br />$4,812,158 <br />$3,746,158 <br />$40,560 <br />$0 <br />PAGE 3 OF 4 <br />