My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. - 5. ICESR 07-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2012
>
07-12-2012
>
3. - 5. ICESR 07-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2012 2:04:42 PM
Creation date
7/31/2012 12:15:30 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
7/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it , i .:_l___i l, I ,^\. ci <br /> ,-_� —__._ _—_....__.__—_____ (may <br /> ex tvf,.1 to ieaG14;;; �\ i i �.w+ <br /> R \ I <br /> ii ) k— .,„ i., <br /> - ' - , LA.,,,,,,1r1,,v .., C <br /> , 0 0 I $frat <br /> ms) <br /> ti I e x t ,G r� if--- 2 C I .r : <br /> I , NI <br /> - 1 r <br /> , ,, ,,e,a -{1, i <br /> r f <br /> ac tl <br /> l I �� , 3' IlitiIl f0 <br /> 0 <br /> 6, w. ref 4.4� <br /> 0 0 0 , <br /> r <br /> 1 t t i <br /> j a <br /> (Renovation Plus): a <br /> • Same upgrades as#2 <br /> • New refrigeration(concrete floor)and refrigeration room for Rink 2,size and prep to add Rink <br /> 1 in the future 1,4',,,,j <br /> • Add varsity locker rooms to Rink 2 :. <br /> • Renovate existing refrigeration and resurfacer room into new resurfacer room with internal large <br /> snow melt pit. <br /> • Add sprinklers over Rink 2 Ice arena floor surface. <br /> • Upgrade IT and PA systems <br /> • Add maintenance room to west side of Rink 1 uu <br /> • New front lobby addition including team rooms,concessions,pro-shop,restrooms,manager's <br /> office. <br /> • Create"shell"space for dryland training facility above new varsity locker rooms. U <br /> • New exterior insulated wall and roof panels on Rink 1. —" <br /> • Add football storage and ice arena maintenance storage to Rink 1. w <br /> • Add elevator > <br /> FE <br /> Pros: <br /> New refrigeration plant sized and ready to add Rink 1 refrigeration. "' <br /> Operationally more efficient;combined ice resurfacer and refrigeration room. Ce <br /> Concrete floor added to Rink 2,multi-purpose opportunities are possible and less maintenance and WI ,,�... <br /> more efficient operation of ice plant. > e <br /> 3 <br /> More energy efficient facility;insulated walls and roof for rink 1,efficient HVAC and dehumidification °' <br /> systems. CL' <br /> Facility will have a new identity because of lobby expansion. �- <br /> Larger lobby accommodates larger events. <br /> Varsity Team rooms are addressed. <br /> ADA issues are addressed. <br /> Cons: <br /> he M <br /> Moil <br /> INLII <br /> Expense <br /> 41 year old Rink 1 structure is being utilized. MINIM <br /> Alternate:Reduce Rink 2 from Olympic size to NHL size <br />
The URL can be used to link to this page
Your browser does not support the video tag.