My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. - 5. ICESR 07-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2012
>
07-12-2012
>
3. - 5. ICESR 07-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2012 2:04:42 PM
Creation date
7/31/2012 12:15:30 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
7/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
imill <br /> Anil 111111' 1.-.Z. <br /> Ipll, _ <br /> 4, 614,41S <br /> 71. <br /> 0 0 C <br /> Ul <br /> o <br /> 0,_-Ho 2 <br /> N <br /> 0 . <br /> 0 0 _ C <br /> PI <br /> Gv.14F+w <br /> 1.1..LA..c/♦ <br /> . 1 <br /> I e€ ,4 p» d®» r t "^ <br /> : <br /> ',' ' At.P'' ''n ',:,'44,''1,1,1:::,,4 , - ' ,''.0',., ,i, :',., 1:' :, ''''' '' -42 _ji- <br /> �% a a "t <br /> y 7 <br /> '� '- <br /> 8 <br /> ., ,,,,,,J.,04.:,.;ww,47:: <br /> r <br /> : `. bile <br /> s 5 n, yy emu <br /> 'gam ....: <br /> Option 2(Minimal Capital Repairs): <br /> • Repair roof system in rink 1 including new roof membrane on Rink 1. 4t <br /> • Repair flat roof area between existing rinks,numerous leaks. <br /> • Remove existing spray insulation from main steel frames and paint. <br /> • Add Low-E ceiling. <br /> • Repair existing steel framing based on inspection after spray insulation is removed. <br /> • Add refrigeration room ventilation to Rink 1. •x <br /> • Add ice resurfacer room ventilation to Rink 1. <br /> CZ <br /> • Replace radiant heating over bleachers in Rink 1. ce <br /> • Add ventilation and make-up air to existing Rink 1 Team Rooms. ` <br /> • Add Dehumidification to Rink 1. "' <br /> • Repair Rink 2 Dehumidification. <br /> • Provide minimum improvements to Rink 2 Refrigeration;limited to new compressors,motors, <br /> and vessel integrity investigation. <br /> LAJ <br /> 2 <br /> Pros: <br /> Minimal cost outlay.to maintain Community asset. <br /> Fixes dehumidificaton problem in Rink 1,helping to maintain the integrity of the steel structure. <br /> Fixes roof leaks on Rink 1,helping to maintain the integrity of the steel structure. W <br /> Addresses life safety issues in Rink 1. „ <br /> Cons: CZ <br /> 2 <br /> Lail <br /> Expense o <br /> Energy efficiency of building is not greatly improved.Insulation and waste heat recovery are not utilized. J { <br /> Refrigeration issues in Rink 2 are minimally addressed. <br /> Rink 2 refrigerated floor is still sand based. <br /> Main components of 30 year old refrigeration systems are still being used. <br /> Environmentally harmful refrigerants are still in use. <br /> No operational improvements to facility,still maintaining two refrigeration and ice resurfacer rooms. <br /> Team rooms for High School are not addressed. immoris <br /> Non-regulation size of Rink 1 ice sheet is also not addressed. <br /> ADA issues not addressed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.