My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. SR 06-11-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
06-11-2012
>
6.1. SR 06-11-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 10:16:41 AM
Creation date
6/8/2012 8:56:30 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Summary -Project Description: <br />The enrollment at Spectrum High School on October 1, 2011 (current school year) is 389 <br />students. This is the maximum enrollment capacity for the amount of space that has been <br />completed in the building to date. The current completed building space of 44,000 square <br />feet was known as Phase I. <br />This summer (2012) we will complete an additional 9,000 square feet on the second floor <br />of our building into 6 classrooms and a teachers lounge. This will be Phase II. The <br />completion on Phase II will allow enough space to increase our enrollment to 525 <br />students. Phase II will meet the legal requirements for occupancy of 525 students (which <br />is the maximum per our CUP). We have already conducted an enrollment lottery and <br />have 525 students enrolled for the 2012-2013 school year. <br />Phase III will be a 6,600 square foot addition to the school building. The 3 additional <br />classrooms and large music room gained with this will afford additional space for the <br />expanding music and band programs and eliminate teachers needing to rotate from one <br />room to the next. Phase III will eliminate about 12 parking spaces which will be replaced <br />by adding a new parking lot with 47 spaces in the SE corner of the athletic field adjacent <br />to the school. Phase III will not increase our CUP which will remain at 525 students. <br />An important component of Phase III is the purchase of land for athletic fields. The <br />athletic field land will be constructed into two football/soccer fields which will be used <br />by Spectrum High School for practices and competitions. In addition, Spectrum has been <br />conducting discussions with the City of Elk River regarding shared use of the fields; <br />perhaps with local football or soccer associations. <br />The purchase of the athletic fields comes complete with a 2,400 square foot storm <br />building large enough for 300 people that will be modified to include rest rooms and a <br />locker room. We hope to eventually add a field house to the storm building. The field <br />house will be able to be used for our wrestling program (which currently meets in <br />warehouse space under a separate CUP) and Physical Education classes could use the <br />field house during the day. The field house may also become part of a shared use <br />agreement with the City of Elk River. <br />
The URL can be used to link to this page
Your browser does not support the video tag.