My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 06-04-2012
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2012
>
06-04-2012
>
4.5. SR 06-04-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2012 12:44:04 PM
Creation date
6/1/2012 12:44:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/4/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Compiles and formulates reports for state and city <br />G Communicates with affected residents <br />D. Communicates city engineer's intentions to contractors <br />E. Keep records fox payment and record drawings <br />Performs other essential job duties <br />A. Regular and timely work attendance <br />B. Follows all safety procedures <br />C. Participates in safety training <br />Required Knowledge, Skills, and Abilities <br />^ Ability to interpret plans and specifications <br />^ Ability to remain up to date on professional knowledge and skills <br />^ Ability to work independently and assume responsibilities with minimal direction and <br />supervision <br />^ Ability to effectively communicate both orally and in writing <br />Minimum Qualifications <br />^ Two-year Civil Engineering Technology Degree <br />^ Five years' experience in related field <br />^ AutoCAD software training (Land Desktop, Map & Civil) <br />^ Certified Professional in Erosion and Sediment Control (CPESC) Certification ox the ability <br />to obtain within one year <br />^ ArcMAP software training <br />^ Valid driver's license <br />Preferred Qualifications <br />^ Erosion Control Inspector/Installer & Erosion Control Design <br />^ Constmcdon safety training (Gopher One Call) <br />^ MnDOT Certifications in Aggregate Production, Bituminous Street I and II, Bituminous <br />Plant I, Concrete Field I & II, and Grading and Base I & II <br />^ Microsoft Word and Excel <br />^ Construction cost estimating <br />^ Knowledge of right-of-way and easement acquisition process <br />Page 2 <br />13n~uiecriug Tech I.I (41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.