Laserfiche WebLink
Take down old soffit. $ 400 <br /> <br />Repair and finish the suspended ceiling. <br /> <br />$ 1500 <br /> <br />Install a sprinkler system where the cooler system <br />was removed. <br /> <br />$ 2,200 <br /> <br />Construct handicap accessible male & female <br />bathrooms. <br /> <br />$15,000 <br /> <br />Install heating and return airs in the old cooler space <br />and into the new bathrooms. <br /> <br />$ 2,000 <br /> <br />Install lighting in the old cooler space. <br /> <br />$ 1,200 <br /> <br />Install two new furnaces. <br /> <br />Total Estimated Cost: <br /> <br />$ 5,000 <br /> <br />$ 37,150 <br /> <br />If all of this work is done on the main floor of the old liquor store, as you <br />enter the building you would see a finished, sheetrocked wall with a <br />suspended ceiling and lights, two bathrooms that are handicap accessible, <br />and a sprinkler system throughout the building. Once these alterations <br />have been made, it will be easier for perspective renters to estimate their <br />costs for their own improvements. An example would be the youth group who <br />would have to install flooring and set up pool tables, etc.; it would be ready <br />for their use. For a general office occupancy, everything would be complete <br />except possibly office partitions, etc. This would complete the majority of the <br />work needed for most uses. <br /> <br />If you have any questions regarding this outline, please don't hesitate to call <br />me. <br /> <br />f:\shrdoc\b &z\cliffxoldliq.doc <br /> <br /> <br />