Laserfiche WebLink
Case File: 12-08 <br />Page 3 <br />Elk River Station II <br />The process to amend a Planned Unit Development is through a Conditional Use Permit. The standards <br />above apply, although the Planning Commission is asked to consider them in more general terms. <br />In the review of the standards for CUP as outlined, it appears that the request is consistent with all of <br />these standards. <br />ANALYSIS <br />The applicant proposes to change the allowable uses to include residential, specifically an apartment <br />building. <br />Staff is not supportive of a change in land use merely due to a poor economy. Part of the benefits of <br />zoning is to establish areas within a city for different uses, densities, and infrastructure needs. These areas <br />will be developed over time, providing for the logical evolution of the city. As different sectors <br />(residential, commercial, industrial) peak and valley, their growth does not eliminate opportunities for the <br />other sectors. <br />In this situation, the PUD for Elk River Station, developed well before the train station was approved, <br />anticipated `trips' to and from the commuter rail station supporting commercial planned. In addition to <br />the subject parcel, four other commercial parcels were planned, including a .day care business. In reality, <br />commuter rail uses traditionally do not visit. shops near a station; they tend to get in their car and go. The <br />habits. of a commuter rail user differ greatly from that of a light rail uses, with more frequent daily stops, <br />and a smaller service area that is covered by walking. A commuter rail station generates 10 stops or so a <br />day (5 in the AM, 5 in the pm); not a volume necessary. to support these businesses alone.. <br />It became evident during the Focused Area .Study (FAST) planning .process that an idea for retail <br />immediately adjacent to the train station was not likely to be successful; in fact the FAST study identifies <br />the subject area as Transit.Center, and includes residential uses. <br />To build an apartment building on the subject parcel, the following applications will need to be <br />.processed, at minimum: <br />-The property will need to be platted (public hearing) <br />-A Conditional Use permit will need to be approved for the building (public hearing). <br />Natural Resources <br />The site is covered by trees; most, if not all, of these trees will be removed for development. <br />Parks <br />Through the platting process, the Park Commission will identify the park dedication requirements. <br />Access <br />Access to the site will be further studied, but is expected to incorporate the existing drive off of Twin <br />Lakes Road, shared with the commuter rail parking lot. <br />ATTACHMENTS <br />^ Location Map <br />^ Applicant's Narrative <br />^ Location Map <br />N:\Departments\Community Development\Planning\Case Files\CUP\CU 12-08 Duffy-Depot ER Station\CU 12-08 Depot II SR to PC 5-8- <br />12.docx <br />