My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. ERMUSR 04-10-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2012
>
04-10-2012
>
5.1. ERMUSR 04-10-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2012 3:35:14 PM
Creation date
4/11/2012 8:53:42 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
4/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cov~s~wat~,ow r~v~,ol K,2~ ,4cco~cwts <br />I . Remained active in Energy City activities including Project <br />Conserve. Project Conserve Phase 2, consisting of 119 <br />participants, was completed in 201 I .The participants saved an <br />aggregated total of 72, 148 kWh in energy, which was <br />approximately a 6% reduction from the previous years' <br />consumption. The 70 participants connected to the Utilities <br />water system saved an aggregated total of 514,000 gallons. <br />Natural gas savings amounted to a decrease in consumption of <br />2% from the previous year. <br />2. Administered rebates for 2,661 residential customers for a <br />total of $49,000. These rebates were associated with energy <br />efficiency improvement resulting in additional customer <br />energy savings of $44,727. <br />3. Administered rebates for 38 commercial customers for a total <br />of $ 132,248. These rebates were associated with energy <br />efficiency improvements resulting in additional customer <br />energy and capacity savings of $233,296. <br />4. ERMU sold over 535,000 kWh of energy from wind <br />generators in 201 I through our Wind Power Program. <br />5. The third party wind generator, which is used by Energy City <br />as a demonstration site, produced approximately 855,828 <br />kWh in 201 I .The annual capacity factor is 14.8%. This is low <br />in comparison to other wind generators; however, this is due <br />to the lack of sufficient wind resource available in this part of <br />the State. <br />r ~~~ ~„ ~, <br /> <br />6. ERMU's landfill gas electric generating plant produced 25.17 million kWh with a capacity <br />factor of 94.5%. This is down from 25.7 million kWh in 2010. This plant produced <br />enough energy from a local renewable fuel source to provide for 9. I % of Elk River <br />Municipal Utilities' customer's needs. <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.