My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.6. SR 03-16-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
03/16/1998
>
4.6. SR 03-16-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:07 AM
Creation date
9/29/2003 7:32:10 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/16/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/12/98 13:54 FAX 612 647 4120 NELSON-RUDIE -- ~°°1/0°5 <br /> <br />Nelson-Rudie & Associates, Inc. <br />Consulting Engineers <br />2575 University Ave. West, Suite 140, St. Paul, MN 55114 <br /> <br />Dennis A. Nebon, P.E. <br />,~t[ F. Rudie, P.E. <br />Andrew N. Erdmann, P.E. <br />,Joseph M. Pearce, P.E. <br />Michael D. Woehrle <br /> <br />March 12, 1998 <br /> <br />iVJx. Rich Czech <br />Elk River Arena <br />1000 School Street <br />P.O. Box 720 <br />Elk River, Minnesota 55330 <br /> <br />Re: Dehumidification System <br /> Elk River Arena <br /> <br />Dear Rich: <br /> <br />We would like to thank you for requesting a proposal to prepare a feasibility study for the <br />above referenced project. It is our understanding that the scope of the report for the <br />project will consist of the following items: <br /> <br />1. Review the existing ventilation and dehumidification system design and <br /> recommend possible revisions to improve the operation of the system. <br />2. Prepare a schematic design narrative outlining design revisions to address the <br /> following systems. <br /> <br /> a. Desiccant based dehumidification system for the arena. <br /> b. Heat for the arena. <br /> c. Ventilation requirements of the arena. <br /> <br />3. Review the rebate options available for design of the system and for the purchase <br /> of a desiccant based dehumidification system. <br />4. Preparation of a budget estimate for the project <br /> <br />We will prepare the feasibility study for the lump sum fee of One Thousand Two <br />Hundred Dollars ($1,200.00) <br />We have enclosed a list of references for ice arena projects we have recently completed. <br />All of the arenas were designed with desiccant based dehumidification systems. We have <br />had great success with the units and are confident that we can solve the humidity <br />problems at your arena. <br /> <br />612/644-2400 E-Maih nelsonrudie@ibm.net <br />Fax: 6121647-4120 Modem: 612./647-4139 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.