Laserfiche WebLink
.SENT BY:IIIM~[ETINO & <br /> <br />; 3-12-95 ; 4:071~ ; ~INNEGASCO--, <br /> <br />9-241-9432;# 1/ <br /> <br />Date: <br />TO: <br /> <br />From: <br /> <br />lVlavoh 12, 1998 <br /> <br />Rich Cz~:-h - Elk River Corporate Ice Arena CEO/Manager <br />Fax 241-9432 <br /> <br />Bryan Petricka - Mmnegasc. o <br />321-4323 <br />x-321-4397 <br /> <br />Ice Arena Desiccant Example Rebate Table <br /> <br />Again, thc above rebates are estimates. Actual dollar amoums will depend on e~ginecring <br />bid/spec docaimcms. <br /> <br />Also, in order to receive the cuginccring rebate at $ 20 per avoided ton, thc natural gas <br />fired desic, c. mlt unit/project must be submitted to vendors and/or contractors in a "bid" <br />form. The ea]gineering rebate is provided to cust(aner to aid (but not to cover all of the <br />costs) in engin¢cring/dcsignin$ a natural gas based cooling/dehumidification package. <br /> <br />I.ast .ly, the $ .90 per avoided ton rebate is provided to the customer to aid in the first costs <br />of the desiccant specific equipment. Again, it is meant to offset some of the first costs. <br /> <br />H:workart:a:bmpctri:¢lkk~ <br /> <br /> <br />