My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5. HRA SR 03-05-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2012
>
03-05-2012
>
5. HRA SR 03-05-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2012 12:24:10 PM
Creation date
3/1/2012 9:32:02 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
3/5/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Li~~'~~~ . , fi <br />~ ~- <br />., <br />~, .. . <br />- ~::,. <br />~ ., ~:,~~ <br />Minneapolis Park and Recreation Board, Minneapolis, MN <br />After completing a series of concepts forthe south shore area of Lake Calhoun, the Minneapolis Park and Recreation Board asked HKGi to <br />develop and implement the design. The first phase of the south shore area, located at the confluence of Calhoun Parkway and William <br />Berry Parkway, includes the redesign ofthe parking lot and realignment of the bicycle trail. The focus ofthe design is to showcase Best <br />Management Practices related to sustainability including: <br />Minimizing stall and drive aisle size <br />Permeable paver stalls <br />Permeable turf stalls <br />Rainwater gardens - <br />Efficient lighting <br />The parking lot site sits at a very popular intersection of the park system. It is between Lake Calhoun and Lake Harriet, two of the most <br />used recreational areas in the Twin Cities. The Park Board intends to use this highly visible space to educate and bring environmental <br />awareness to its visitors. HKGi prepared construction drawings and specifications for public bid and Oversaw the Construction <br />Administration during the construction period. Phase two improvements to the west of the parking lot will evolve further as funding <br />j~~ught. <br />o~~~ , . _. ~ n..,_o -, ,. ~ .~_~ ~ -~~„-«. _. ~~,_„~„- ou~r,~,~.~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.