My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4. PCSR 02-08-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Site Plan Review
>
2012
>
02-08-2012
>
4. PCSR 02-08-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2012 12:20:53 PM
Creation date
2/2/2012 12:13:26 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/8/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Number of parking stalls, existing and additional <br />The current bank facility/site has approximately 30 parking spaces on the Main <br />Street and river side levels. City ordinance would require 122 spaces. <br />Of the 30 existing on-site parking spaces, eight spaces would be eliminated to <br />provide adrop-off and pick-up lane as well as a play area for children. The <br />purpose of the drop-off lane is to create a safer parking program for visitors to the <br />site. It also addresses ADA loading zone requirements. <br />The Master Plan shows approximately 22 spaces available on site, leaving the <br />need for an additional 100 parking spaces. The primary time for the majority of the <br />church's parking needs will be on Sunday morning. The downtown commercial <br />parking needs are typically at their lowest when the church's needs are highest. <br />The church has contacted Dare's Funeral Home regarding the use of their lot on <br />Sunday mornings which has approximately 45 parking spaces. Dare's and the <br />church are working on a document to finalize this agreement. <br />The church has also contacted the 1St National Bank regarding the use of their lot <br />on Sunday mornings which has approximately 30 parking spaces. The bank and <br />the church are working on a document to finalize this agreement. <br />Is there proposed screening of the site? <br />Existing parking is being utilized and no screening is planned. <br />Proposed building materials <br />How do they comply with applicable design standards? <br />The master plan would utilize a brick matching the existing building's brick in size <br />and color. To complement the brick and other downtown materials the existing <br />white stucco surfaces will be softened by painting abeige/tan color. The <br />incorporation of stonework is intended to complement and tie into the plaza space. <br />Signage <br />The Master Plan shows the church name on the two walls facing Main Street. The <br />signage would be in the form of individual letters attached to the brick surfaces. <br />The size would comply with City Ordinance. A secondary individual letter sign of a <br />smaller size is shown on the east wall facing the public parking lot. <br />Is there outdoor storage <br />The Master Plan calls only for the reuse of the existing recycle center located on <br />the lower level. Screening for the existing recycle center is planned. <br />VANMAN ARCHITECTS AND BUILDERS INC. <br />669 Winnetka Avenue North • Suite 210 • Minneapolis, Minnesota 55427 <br />888.327.2817 • 763.541.9552 • fax 763.541.9857 <br />www.vanmanab.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.