My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1 PCSR 1-10-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
01-10-2012
>
5.1 PCSR 1-10-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2012 12:13:19 PM
Creation date
1/5/2012 2:33:15 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/10/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
least a ""biannual basis the availability of this public drop off facility and the fee charged <br />for it, and shall cooperate with the City in recycling efforts. <br />17.) Wash Water and Storm Water Run Off. All truck and facility wash water at the Resource <br />Processing Emil-it~Plant shall be diverted and captured in a retention tank so it does not enter the <br />groundwater system. Captured wash down water shall be disposed of as required by the MPCA, <br />',and shall not be disposed of in the City's Waste Water Treatruent Plant unless approved b <br />City. Testing of storm water run-off captured in the on-site retention detention pond shall be <br />conducted in accordance with State requirements. Licensee shall provide City evidence of storm <br />water NPDES permit coverage for industrial activities and a copy of the Licensee's Storm Water <br />Pollution Prevention Plan. <br />18.) Ash Disposal. ERS Site: All ash shall be permanently transported out of the City. Ash <br />disposal shall strictly comply with the requirements of Chapter 58, Article III of the City Code and <br />the requirements of Chapter 7035 of Minnesota Rules. Ash deposited in the State of Minnesota <br />shall only be permanently deposited in solid waste management facilities which have been <br />specifically designed for ash disposal; which have been approved by the Minnesota Pollution <br />Control Agency for ash disposal; and which are equipped with a line and leachate collection <br />system adequate to collect all leachate which may be generated at the Site. <br />_. _-- Comment [A61:. This could ire removed. If <br />deemed necessary to retain in this docurneni <br />we could r~ .~ ~,ri i'r. ~1 disposal with the r'ih <br />-onlyi~hro~i_l~ a~,i~r~;~~r~ateapprovals. <br />19.) Security and Litter Control. RPP Site: The Resource Processing l~-Plant shall be <br />enclosed by a minimum six foot and no more that eight foot high chain link fence. Licensee shall <br />engage in a regular and routine litter maintenance and removal program as requiredby the <br />~C~• _-- <br />20.) Si~na~e. Licensee shall erect and maintain at each entrance to each component of the <br />laeili~yProject a permanent sign stating the name of the Project fEacility, the MPCA Permit <br />number and stating the hours and days the tae-iliafacility is open for public use. <br />21.) On-Site Inspection. <br />(O1) Resource Dr°° ~'- ~'^°~'~~•~D°°°-~°-^~ Processing P~eiee~lant. The City shall have the <br />right of access to all areas of the Resource Processing Plant ^~a '''° nun e:,° for the <br />purpose of inspection to ensure compliance with all of the terms and conditions of this License, the <br />Permit for the I~Project, and Chapter 58, Article III of the City Code. The City need not give <br />prior notice to the Licensee for personnel to access the Resource Processing L~}~Plant ^. <br />&~during waste receiving hours, Monday through Saturday, or if an explosion or other <br />emergency occurs. At any other time, at least twelve (12) hours prior notice to the Licensee is <br />required. Such access shall be in accordance with reasonable safety standards and reasonable <br />proprietary information requirements. Inspectors shall have the right, at any time, to take one or <br />more of the following actions: <br />i. Order a load of MSW inspected, pursuant to the procedures set forth in this License; <br />ii. Order the Resource Processing ~}~Plant shut down if necessary to bring it into <br />compliance with any other term or condition of this License, the Permit for the <br />Project, or Chapter 58, Article III of the City Code. <br />Comment[A7]:1 ilv~n~~hi theset«esof <br />ua-rns ~crrr, not s~~in<_~ m n=ide in the CUY <br />;inkwore'. <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.