Laserfiche WebLink
. - -, , <br />12.) RDF and Reject Disposal. All wastes received shall be disposed of in strict compliance <br />with the requirements of Chapter 58, Article III of the City Code and Chapter 7035 of Minnesota <br />Rules. <br />13.) RDF Truck Haul Routes. To minimize the impact of the F~Project on other land uses <br />and activities in the area, incoming and outgoing traffic from the Iiae~li~y-Project facilities shall be <br />controlled by the Licensee in such a manner as to provide orderly and safe ingress and egress and <br />- so as not to impede or interfere with general traffic. <br />14.) Processing and Storage Areas to be Fully Enclosed. <br />(O1) P~7~RPP Site. All MSW and RDF receiving, processing, and storage areas at the ~- <br />RPP Site shall be fully enclosed except that bulky rejects (e.g., tanks, white goods, tires etc) may <br />be stored outside the building in covered shelters and hot loads maybe temporarily stored in the <br />hot load area. Adequate facilities shall be provided to insure that under no circumstances will <br />there be any exterior storage of MSW or RDF, except in enclosed trailers or trucks. Licensee shall <br />create a 20-foot open space (fire break) between the conveyor on the tipping floor of the Resource <br />Processing Easili~Plant to the garbage on the tipping floor. All RDF haul trucks leaving the <br />Resource Processing Ft3~Plant shall be securely covered so that no RDF or other matter may <br />escape. <br />(02) €4~ERS Site. All RDF receiving, handling, and storage areas at the HERS Site, shall <br />be fully enclosed and sprinkled as needed to minimize dust and/or odor, including the pit in the <br />receiving building, the hood over the conveyor in the receiving building, and the entire RDF <br />conveyor from the receiving building to the burners. Adequate ash storage facilities shall be <br />provided to insure that under no circumstances will ash be stored in anything but fully enclosed <br />structures. Ventilation and filters shall be provided for this building sufficient so that ash particles <br />are not being exhausted outside the building. All ash and other haul trucks leaving the Energy <br />Recovery Station shall be securely covered so that no ash, residue, or other particulate <br />matter may escape. <br />15.) Hours. The Project, including the transport of RDF, may operate twenty-four (24) <br />hours a day. The City reserves the right to restrict the hours of operation of the tae-ik~}~Resource <br />Processin Pg lant to normal Business hours if noise emanating from the lit facility to <br />surrounding residential properties is unacceptable or if necessary to protect the public health, <br />safety or general welfare. <br />riurrc-rcaccovsaxTcv7nviceE~-txxe~ccvxx6 13ea1t13, sa€et~e~~er~eral wel aye. <br />16.) Drop Off Area. RPP Site: Licensee shall provide an area at the Resource Processing <br />Plant for disposal of solid waste by individual citizens. Licensee shall also advertise on at <br />Page 11 <br />