Laserfiche WebLink
City of Elk River <br />Braun Project BL-11-6693 <br />November 17, 2011 <br />Page 3 <br />Since the brick common wall will remain in place after the demolition, the final finish of the wall will need <br />to be addressed once it is exposed. The flashing aspects along the roof and corners will need to be <br />addressed as well as the aesthetics of the wall. Once the conditions are exposed, further evaluation may <br />be needed by a design professional to provide appropriate construction details. The contractor should <br />be prepared to provide some temporary flashing (or permanent if they are qualified) until a permanent <br />detail can be provided. <br />General <br />In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by <br />reputable members of its profession currently practicing in the same locality. No warranty, express <br />or implied, is made. <br />The information, observations, and opinions stated in this report are based on visual observations made <br />by Jason Hanlon and were based on our professional engineeringjudgment and professional practice. <br />If you have any questions, please contact me. <br />Sincerely, <br />Braun Inte ec C%r~ <br />J son S. Hanlon, PE, SE <br />Attachment <br />Reference Sketches of Plan View and Wall Condition <br /> <br />I~~~~~~~ <br />