My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4. HRSR 12-12-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2011
>
12-12-2011
>
4. HRSR 12-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2011 12:52:45 PM
Creation date
12/9/2011 12:36:00 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
12/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maintained by the Contractor and authorized for release by the HRA, and from <br />Contractor's unlawful disclosure or use of data protected under state and federal laws. <br />Section 3. Contract Price <br />3.1. The HRA shall pay the Contractor $59,600 for its performance of the Work under <br />this Contract. <br />Section 4. Project Schedule <br />4.1. Contractor shall commence the Work on or after Contract execution. Upon <br />execution of this Contract, the Contractor shall provide the HRA with a schedule of the <br />work. The Work shall be completed no later than January 5, 2011. <br />Section 5. State and Local Permit Requirements and Related Submittals <br />5.1. Contractor shall obtain and pay the cost of, all permits required by the City of Elk <br />River, including, without limitation, a plumbing permit (for water and sanitary sewer <br />disconnects) and a demolition permit. Questions about permits, permit fees, and the <br />scheduling process for any required inspections should be directed to Annie Deckert of <br />the HRA at: (763) 635-1042. <br />5.2. No less than two days prior to beginning the Work, the Contractor shall provide <br />the HRA with a description of the measures it proposes to take in order to control dust <br />and noise during the performance of the Work. <br />5.3. Contractor shall obtain MPCA 10 day approval notification. <br />5.4 Upon completion of the Work, Contractor shall provide the HRA with: <br />5.4.1. Copies of any permits required by government agencies other than the <br />City of Elk River, such as transport or disposal permits. <br />5.4.2. Copies of any test results required by government agencies other than the <br />City of Elk River. <br />5.4.3. Copies of landfill records indicating receipt and acceptance of the <br />Hazardous Materials by a landfill licensed to accept Hazardous Materials. <br />Section 6. Job Conditions -General <br />6.1. Contractor must disconnect and abandon all utilities serving the Property, <br />including water, sanitary sewer, electricity, gas and telecommunications or arrange for <br />disconnection and abandonment of same at its own expense. Contractor shall not begin <br />any work pursuant to this Contract until the HRA has verified that disconnection and <br />abandonment have been completed. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.