My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. SR 01-26-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
01/26/1998
>
4.0. SR 01-26-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:04 AM
Creation date
9/8/2003 8:25:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that are to be preserved. A US West underground utility box and two telephone <br />manholes exist on the northwest side of Jarvis Street at TH 10. The appropriate utility <br />companies will be consulted to discuss potential conflicts and determine an appropriate <br />resolution. <br /> <br />The majority of the project area is zoned Il-Light Industrial, with a portion of the area <br />abutting TH 10 being zoned C3-Highway Commercial. The platted right-of-way is 66 <br />feet wide. An additional 17 feet of right-of-way is present along the northwest side of <br />Jarvis Street for a distance of 500 feet from the TH 10 right-of-way. This additional <br />right-of-way was provided with the platting of the Renner Addition. <br /> <br />PROPOSED IMPROVEMENTS <br /> <br />A. Street Construction <br /> <br />The proposed street construction, shown on Exhibit 2, consists of the <br />reconstruction of Jarvis Street from TH 10 to 156th Avenue. Jarvis Street will <br />be reconstructed to a 44-foot wide street with barrier concrete curb and gutter. <br />A 44-foot wide street will provide a through/left turn lane and right turn lane at <br />TH 10. The proposed street section shown on Exhibit 3, consists of 9" of <br />aggregate base, Class 5, 2" of bituminous base course, and 1 iA" of bituminous <br />wear course. This is a 9-ton street section based on a soil factor of 75 and <br />traffic volumes projected 20 years. A geotechnical investigation has been <br />completed verifying these assumptions, and is included in Appendix B. <br /> <br />Proposed storm sewer, as shown on Exhibit 4, is to be constructed to provide <br />for the drainage of Jarvis Street. The proposed storm sewer improvements <br />consist of constructing an 18-inch RCP culvert at TH 10 with catch basins, and <br />the construction of 18-inch RCP storm sewer along Jarvis Street. As shown on <br />Exhibit 4, an inlet apron will be placed in the ditch at Furniture and Things to <br />provide an overflow for the Furniture and Things Mega Furniture Mart storm <br />sewer system. <br /> <br />Runoff that is collected in the TH 10 ditch will flow to a drainage swale at Lee <br />Fredrickson's Auto Sales that drains to a storm water pond on the north side of <br />the property. The existing ditch along TH 10 will require grading and <br />reshaping along with the replacement of driveway culverts to provide for <br />positive drainage. <br /> <br />FEAS-230.335 2 230335m <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.