My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. SR 01-26-1998
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1998
>
01/26/1998
>
4.0. SR 01-26-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:04 AM
Creation date
9/8/2003 8:25:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/26/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Howard R, Green Company <br /> CONSULTING ENGINEERS <br />January 21, 1998 <br />File: 800110j-0060 <br /> <br />CON~SIILTING ENGINI~ <br /> <br />Formerly MSA <br />Consulting Engineers <br /> <br />Mr. Pat Klaers <br />City Administrator <br />City of Elk River <br />13065 Orono Parkway <br />P.O. Box 490 <br />Elk River, MN 55330-0490 <br /> <br />RE: EAST ELK RIVER IMPROVEMENTS <br /> <br />Dear Mr. Klaers: <br /> <br />This correspondence is intended to review the work we have begun in the East Elk River area, <br />based on the City Council's action at the January 5, 1998, workshop. As you are aware, prior <br />to that meeting, there were several things that we had been working on. These included the <br />following: <br /> <br />The Signal Justification Report (S JR) for 171st Avenue at TH 10 has been prepared <br />and submitted to Mn/DOT for review and approval. <br /> <br />An ISTEA application has been submitted to Mn/DOT for the proposed transportation <br />corridor. <br /> <br />Evergreen Land Services Company has been contracted to begin land acquisition <br />between 173rd and 171st Avenues. In conjunction, with that, a preliminary survey was <br />done of the road alignment 'in this area and preliminary street grades were established <br />to determine if any additional temporary easements would be needed. Patchin and <br />Associates have been contacted and have on their schedule to appraise the property in <br />question within the next 30 days. <br /> <br />We have been working with the Burlington Northern/Santa Fe Railroad regarding the <br />opening of the new crossing at 171st Avenue. Mr, Spencer Amt has been contacted <br />from the railroad company regarding the preparation of an agreement between the <br />railroad and the City for this new crossing. <br /> <br />Preliminary surveys have been accomplished for the area west of TH 169 in the vicinity <br />of the UPA property and along the 5th Street and Baldwin Avenue area. These were <br />done in an effort to get as much preliminary survey work accomplished as possible prior <br />to snowfall, anticipating the City Council ordering plans and specifications during the <br />winter months. <br /> <br />1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll free 800/888-2923 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.