My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR STAFF UPDATES 11-15-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
11-15-2011
>
6.1. ERMUSR STAFF UPDATES 11-15-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 8:30:13 AM
Creation date
11/15/2011 8:29:57 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River, <br />Municipal Utilities <br />UTILITIES COMMISSION MEETING <br />PBWEAEU B1 <br />A~UR~ <br />P O W E R E D r 0 5`° <br />TO: FROM: <br />Elk River Municipal Utilities Commission Wade Lovelette-Superintendent of Technical <br />John Dietz, Chair Services <br />Daryl Thompson, Vice Chair <br />Al Nadeau, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />November 15, 2011 6.1 <br />SUBJECT: <br />Staff Updates -Superintendent of Technical Services <br />• The Locating department had a total of 2601ocate tickets, eight of them being emergency <br />tickets. <br />• Security Systems Department had another good month in October. The monthly totals <br />were not available at the time this update was prepared. <br />• The Mapping Department started putting the changes into the mapbook so that they are <br />ready to print a revised edition. <br />• The Meter shop continues changing electric and water meters. <br />• Landfill Gas Plant had a critical memory failure in a SEL Relay on engine #4. Staff had <br />to change the relay out and sent it to Cooper to upgrade. <br />• We took oil samples from substation transformers to look for abnormal gasses (we do this <br />on a once a year basis). <br />• The power plant staff did the monthly run of the generators. It went very well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.