My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 10-11-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
10-11-2011
>
4.1. ERMUSR 10-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2011 2:39:52 PM
Creation date
10/10/2011 2:39:51 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Troy Adams /September 27, 2011/ Page 3 <br />provided valuable project experience related to power supply evaluations in this region. <br />References can be supplied on these projects if desired. <br />PSE has the necessary experience base, in power supply evaluations, strategic planning, and <br />contract analysis to help Elk River Municipal Utilities with the current project. Our Project <br />Tasks aze broken out into an "ala cart" approach, where for the most part they can be selected as <br />individual items off the menu to allow the greatest flexibility in using outside resources. <br />Analysis for a decision stazting in 2018 will be a balance of both strategic and analytic <br />evaluations, knowing that there aze inherent uncertainties when making a long range projection. <br />Over-emphasis on the analytic evaluation for a long term projection can provide a decision <br />maker with a false sense of accuracy, and not take into account the strategic measures that aze <br />also important when making a power supply evaluation. PSE has sought a balanced approach in <br />this proposed scope of work. <br />Project Tasks <br />The following is a description of the project task azeas that can be provided by PSE. <br />1. PROVIDE INITIAL COMMENTS ON AVAILABLE CMMPA STUDY INFORMATION <br />CPPA has been conducting a power supply evaluation and ERMU is facing a decision <br />whether to continue participation, or move to consider other power supply alternatives. <br />Reviewing information that is available to date will provide necessary background for PSE to <br />"catch up" to your evaluation. PSE will review the study information and provide initial <br />comments in order to be prepared for the outcome of the study findings. <br />2. PROVIDE LIST OF VIABLE ALTERNATE POWER SUPPLY ALTERNATIVES AND PROVIDE <br />HIGH LEVEL SCREENING <br />In order to provide a means of comparing other power supply alternafives with the CMMPA <br />portfolio, PSE will screen the viability of a select number of entities that are likely to be <br />capable of providing the power supply resources to meet ERMU needs. The screening of <br />power supplier information will be conducted using readily available information and <br />summarized in both presentation and report formats. The alternative power supply <br />information will be compared to the CMMPA portfolio. <br />An important element in the screening analysis will be setting up the strategic scoring system <br />that will be used to evaluate all power supply alternatives available to ERMU. Elements of <br />the scoring system aze expected to include the comparison of the ERMU demand and energy <br />requirements to the power supply total resources, type of generation in the supplier portfolio, <br />resource development risk, amount of energy expected from the energy mazket, type of <br />organizational structure (Co-op, muni, Investor Owned etc.), governance structure, and cost <br />projections. This scoring system will provide amulti-dimensional basis for comparing <br />various offerings. PSE's approach is not to pour hundreds of hours into the numerical analysis <br />of the offerings, but to seek comparable projections from the parties, and use the scoring <br />system to provide a well rounded assessment to the ERMU Commission in making important <br />
The URL can be used to link to this page
Your browser does not support the video tag.