My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 10-11-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
10-11-2011
>
5.1. PCSR 10-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2011 3:34:47 PM
Creation date
10/7/2011 3:14:59 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
10/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR ACTION <br />TO ITEM NUMBER <br />Plannin Commission 5.1. <br />AGENDA SECTION MEETING DATE PREPARED BY <br />Plannin October 11 erem Barnhart, Plannin Mana er <br />ITEM DESCRIPTION REVIEWED By <br />Request by Cornerstone Auto Resource for Preliminary and erem Barnhart, Plannin Mana er <br />Final Plat Approval for plat of Jabez, Public Hearing -Case No. REVIEWED BY <br />P 11-01 <br />ACTION REQUESTED <br />Staff recommends approval of the preliminary and Final Plat as illustrated on drawings date stamped <br />September 26, 2011, with the following conditions: <br />1. Additional right-of--way of about 16.5 feet shall be provided along 171st avenue in the area of <br />the existing house. <br />2. The plat shall provide access control along Highway 10 frontage prohibiting access. <br />3. The development shall meet all applicable fire codes. The Fire Chief shall verify the location <br />of all fire hydrants, and may require additional hydrants necessary to preserve the health and <br />safety of the residents. <br />4. The following fees shall apply: <br />a. A Surface water management fee for lot 1 shall be paid at the time the Final Plat is <br />released for recording. (currently $1,179 per acre or $20,903.67 total). Surface water <br />management fee for outlots A and B shall be paid at the time those lots are platted <br />and released for recording. <br />5. Park dedication fee shall be paid for 8.05 acres at the time the Final Plat is released for <br />recording. (Currently, this figure is $58,748.90, or $7,298 for 8.05 acres) Park dedication for <br />outlots A and B shall be paid at the time and at the rate applicable at the time they are <br />released for recording. <br />6. All required subdivision/park information shall be provided in an electronic format (.dwg <br />file) as required by the City Ordinance and Land Use Application prior to recording of the <br />plat. <br />7. This approval of the Preliminary Plat shall expire after 1 year, unless the property owner or <br />owner's agent has recorded the Final Plat or received an extension. <br />
The URL can be used to link to this page
Your browser does not support the video tag.