My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2.-5.4. PCSR 09-13-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
09-13-2011
>
5.2.-5.4. PCSR 09-13-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 2:18:23 PM
Creation date
9/8/2011 2:35:20 PM
Metadata
Fields
Template:
City Government
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 <br />Conditional Use Permit for Sanitary Landfill <br />4.1 CONDITIONAL USE PERMIT NARRATIVE <br />The CUP application requires the following narrative to the italicized questions below. <br />Detailed description/scope of project (what is being proposed) <br />See Section 1.2 for a complete description of the proposed project. <br />^ Hours of operation <br />ERL will limit its operations to the hours of 6:00 a.m. to 7:00 p.m. Monday through Saturday, <br />excluding holidays. During that time, the expanded Landfill will be operated in accordance with <br />the operational requirements enforced by the MPCA permit. The expanded Landfill may accept <br />waste during the off hours only under the following circumstances: <br />The wastes have been approved for disposal. <br />Acceptance of waste is necessary during off hours because of extraordinary <br />circumstances. <br />Each instance of off-hour acceptance will receive the prior approval of the City <br />Environmental Administrator and such approval was granted during City business <br />hours <br />^ Number of employees <br />ERL employs approximately 12 people at the Landfill. The Landfill employee numbers are not <br />expected to increase with the development of the expanded Landfill. <br />^ Number of parking stalls (existing and additional) <br />The Landfill employees park their vehicles at the sites' office building located on the north side of <br />the existing Landfill. There are 20 parking stalls located at the office building site as well as <br />ample room for parking in the yard area to the north of the building. No additional parking stalls <br />are proposed for the expanded Landfill. <br />^ Is there proposed screening of the site? <br />The proposed Landscape/Screening plan presented is in accordance with the May 25, 2011 <br />Agreement and shown on drawing "Screening Plan." <br />^ Proposed building materia/s <br />Elk River Landfill SDA ~ Section 4-1 <br />Land Use Application m ~ef7~~~ <br />ELK RIPER IKEFILL <br />l~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.