Laserfiche WebLink
4. a detailed description of the personnel decontamination facilities to be employed <br />including the planned phasing of decontamination facilities between work areas as the <br />work progresses and the methods to be used to collect, store, treat, .and ultimately <br />dispose of personnel decontamination waters and wastes; <br />5. a detailed description of the washdown area for decontamination of vehicles and <br />equipment and the methods to be used to collect above, treat and ultimately dispose of <br />washdown decontamination waters and sediments; <br />6. personal protective equipment types to be used and conditions. for use; <br />7. personal hygiene and personnel decontamination procedures; <br />8. respirator protection program and procedures; <br />9. personnel and ambient air monitoring; <br />10. emergency and first aid equipment and supply; <br />11. dust and particulate emission control; <br />12. monitoring and mitigation of worker heat and cold stress; <br />13. the types of materials .and substances likely to be encountered in the course of the work; <br />and <br />14. property security, property access, and property control. <br />In addition, CONTRACTOR'S HASP shall detail safety procedures appropriate for the Work. <br />CONTRACTOR shall submit the HASP to CITY before beginning the Work and will not <br />commence construction activities until its receipt is noted by CITY and distributed as herein <br />below provided. CITY's review will be only to see that CONTRACTOR'S HASP meets the <br />minimum requirements set forth in these Specifications. CONTRACTOR shall make <br />reasonable changes required by CITY to make CONTRACTOR'S HASP conform to the <br />minimum requirements. When CONTRACTOR'S HASP has been reviewed and accepted by <br />CITY, CONTRACTOR shall distribute five copies to CITY and one copy to Subcontractors, <br />Suppliers, and all other parties that will be required to enter the property for any purpose. <br />Such distribution shall not impose on any party any obligation to approve CONTRACTOR'S <br />HASP, but is intended only for informational purposes to make parties aware of <br />CONTRACTOR'S requirements for entry to the Property. It is not intended that <br />CONTRACTOR'S HASP cover routine construction activities that would not otherwise <br />require a project specific health and safety plan under Laws and Regulations were it not for <br />the potential for contact with contaminated soil and water. <br />CONTRACTOR'S HASP shall designate a qualified individual to act as CONTRACTOR'S <br />Site Safety Officer for purposes of assuring compliance by all persons with <br />CONTRACTOR's HASP. CONTRACTOR'S Site Safety Officer shall be present on the <br />property during all activities that could potentially result in exposure to contaminated soil or <br />01770-1 <br />C:\Users\jbarnhart\,SppData\L,oca1\Microsoft\Windows\Temporary Internet Files\Content.0utlook\C1P8X2PD\Eagles demo.doc <br />