Laserfiche WebLink
Mr. Steve Ach <br />October 16, 1997 <br />Page Two <br /> <br />6. The Preliminary Grading Plan prepared by Lot Surveys Company has a note that indicates <br /> the contours shown are proposed contours from the Grading Plan prepared by MSA <br /> Consulting Engineers. This site was not graded according to the approved Grading Plan. <br /> This site was used for stockpiling excess material which has been removed over the past <br /> year. Therefore, the existing contours should be reverified. <br /> <br />7. There was no proposed Grading Plan or Site Plan presented with the plat. We assume that <br /> these will be presented as development is proposed for each of the two lots. <br /> <br />If you have any questions regarding these comments, please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />Terry J. Maurer, P.E. <br /> <br />TJM:tw <br /> <br />O:~proj\801450~450-2511 .sept <br /> <br />Howard R. Green Company <br /> CONSULTING ENGINEERS <br /> <br /> <br />