My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. SR 08-25-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
08/25/2003 - SPECIAL
>
7.0. SR 08-25-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:59 AM
Creation date
8/25/2003 6:31:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/25/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Budget Worksession Memo <br />August 25, 2003 <br />Page 4 of 13 <br /> <br />these sources. The equipment reserves would be another source but this is not recommended for a <br />project of this magnitude. <br /> <br />The NSP reserve has a balance of approximately $400,000 plus about $185,000 is due into this <br />reserve for the Joplin business park site. In the past, monies from the NSP reserve have gone mainly <br />toward land acquisition and park improvements and most recently the school theater commitment. <br />Half of the annual NSP allocation goes into the city hall 1993 project and the other half goes into <br />the reserve. It appears that the 2003, 2004, and 2005 reserve allocations will need to go for the <br />theater payments. The NSP fund balance can be spent at the discretion of the Council. <br /> <br />The government buildings reserve gets monies from the landfill surcharge. The total landfill <br />surcharge is $1.00 per cubic yard. The city allocates 50 cents of this surcharge toward government <br />buildings. This surcharge is being replaced with the host fee. <br /> <br />All of the available government building reserve funds will be spent on the city hall project. The city <br />hall project is expected to be completed in spring 2004 and the funding for the project is not <br />expected to be completely received until the end of 2004. However, none of the 2005 government <br />buildings reserve has been allocated or committed. Given the current revenues being received, the <br />barn floor and dasher boards could be completely funded with 2005 revenues. Other possible future <br />uses for these reserves includes a number of larger long-term building and land improvements <br />including a 169/CR33 £nte hall site (fire hall #3), completing the police station second floor in 2013, <br />acquisition of the fairgrounds (if it ever becomes available), building a community center, building <br />an outside pool, acquisition and development of park lands, library expansion, street department <br />buildings/expansion, and the YMCA project. <br /> <br />The liquor store is also a potential source of funding for the ice arena barn floor and dasher boards <br />but the liquor store funds may be needed to help balance furore general fund budgets. Also, at some <br />point in time, there is a second store on the horizon where funds will be needed. Nonetheless, this <br />fund could pay half and the NSP fund could pay half and the floor replacement could take place in <br />2004. <br /> <br />In anticipation of a project taking place in the not to distant future it is recommended that the city <br />spend some of its equipment reserves that are designated for the ice arena for the preliminary work <br />that is needed for the floor replacement project. This work would include the preparation of plans <br />and specifications for the bidding of the project and most likely soil borings. Up to $15,000 may be <br />needed for this work. There is approximately $46,000 identified in the equipment reserves for the ice <br />arena. Money has been placed into this reserve in case of emergencies and/or the need to have <br />funds available to make bond payments. <br /> <br />Pavement Rehabilitation Program (PRP) <br />The general approach discussed for funding the PRP is that about one-third would be assessed out <br />to benefited property owners, the city reserve would pay for one-third, and taxes would pay for one- <br />third. It was also discussed that the projects would begin in the $1 million dollar range and gradually <br />grow in the future. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.