My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-09-2008 ICE MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Minutes
>
2000-2009
>
2008
>
01-09-2008 ICE MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2011 1:18:39 PM
Creation date
7/21/2011 1:15:53 PM
Metadata
Fields
Template:
City Government
type
ICEMIN
date
1/9/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />9.Video Presentation System <br /> <br />Rich Czech, Arena Manager, noted that the video presentation took place with <br />limited success. The lighting in the rink did not provide for a very good <br />picture. Discussion took place about the presentation and the results. It was <br />noted that maybe once that the lighting system was changed out, this type of <br />video presentation could then be implemented. <br /> <br /> <br /> <br />10.Advertising <br /> <br />Discussion took place about the possibility of allowing Elk River Booster Club to sub <br />lease a couple of advertising spaces on the rink. Rich Czech, Arena manager, noted a <br />few concerns. One, would we then allow other groups such as Youth Hockey, the <br />Girls booster club, and Skate Club to do the same? Two, they would be competing <br />against the same customers that rent advertising space in the Arena now. Rich <br />reviewed his recommendation to the Commission, allow each organization six signs. <br />The first three would be sold at the regular price, and the second one would be <br />discounted 30%, for a total of six signs. The second sign would only be allowed in <br />the barn or along the Westside of the Olympic rink. <br /> <br />The consensus of the Commission is that there are other fundraising activities that <br />these non profits organization could explore and that the extra work that would add to <br />the staff time is not worth the Arena’s staff time. <br /> <br /> <br />11.New Zamboni <br /> <br />Arena Manager, Rich Czech noted that the bid for the Ice Resurfacer came in about <br />9% over budget. However with the trade in value of the machine, $7,000.00 - <br />$9,500.00, the cost of the machine should be within 1% of the budget. He also noted <br />that the council approved the purchase of the machine and that the machine should be <br />delivered sometime in October. Discussion took place regarding keeping the machine <br />for the outdoor rinks. However Rich Czech noted that if we were to keep the <br />machine, a building (garage) would have to built to house the machine the building <br />would need to be heated and large enough to store the machines supplies as well as <br />water heater large enough to supply of hot water to resurface the rinks. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.