Laserfiche WebLink
<br />6.Lobby Expansion for the Arena / Naming Rights for the Arena <br />Arena Manager, Rich Czech discussed a rendering of the proposed lobby <br />expansion. <br /> <br />Park and Recreation Director, Bill Maertz, stated that the council had a chance to <br />look over the options that were provide by R.J.M.. The council liked option # 2, <br />which is about 2.2 million. The council thought that this was a little high and <br />directed staff to go back to the artistic and make a few changes and to see if the <br />original numbers were accurate. Bill indicated that the original numbers where <br />program numbers, just giving a rough estimate cost of the square footage. R.J.M. <br />went through and did an itemized construction estimate, which put the cost of <br />the project at about $181.00 a square foot., which includes design fees, and <br />construction costs. This brings the project to about 1.8 million. Bill has asked <br />R.J.M. to take about 200 square feet of the project so that the cost of the project <br />would be below 1.8 million, maybe another $150,000.00 to 200,000.00. <br /> <br />The feeling was that with the public works expansion the council is a little <br />hesitate to add another building expansion at this time. It was felt that with <br />naming rights, it could give the boost the project needs to keep the project <br />moving forward. <br /> <br />Alternative funding was discussed about the expansion. <br /> <br />(6:52pm) Commissioner Page and Parks Director Bill Mertz left for Parks and <br />Recreation meeting. <br /> <br /> <br />7.Skate Club Representative to Arena Commission <br />Rich Czech, Arena Manager noted that if the the Arena Commission were to <br />expand by one person it would be the largest Commission the city has. He also <br />noted that Commissions do not have equal numbers and that we may be better <br />off bringing this item to the council if we wish to move forward with it. <br />Commissioner Martin thought that if Skate Club would like to have some <br />representation on the Arena Commission, they could have one of their members <br />run for an at large position. It was noted by the Commissioners that the Skate <br />Club could come to open mike or approach any of the Commissioners with <br />their concerns. <br /> <br /> <br />8.High School Coaches Wall of Fame <br />Rich Czech, the Arena Manager, noted that Kent Madsen is still on board to <br />work with putting something together for the players hall of fames as well as <br />the coaches wall of fame. If all goes well, Kent should have something for the <br />commission to review by August. Discussion took place if assistant coaches <br />should be noted. <br /> <br />