My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. PCSR 07-12-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
07-12-2011
>
5.3. PCSR 07-12-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2011 8:44:07 AM
Creation date
7/8/2011 8:40:44 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
7/12/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case File: CU 11-06 <br />Page 4 <br />The Crossing Church <br />Conditional Use Permit <br />A. Water service connection. City Staff, including the Fire Marshall, have recommended that the water <br />service connection and a fire hydrant be connected to the watermain along Jackson Avenue. The <br />applicant objects, due to costs. <br />The recommendation is being made because in the event of a fire, the 8' main along School Street may <br />not be sufficient to serve School street developments and the building. Using the 16' main along Jackson <br />helps spread the demand to two areas. <br />B. Signs. In addition to the freestanding signs noted about, the building proposes a number of wall signs. <br />The ordinance permits 1 wall sign, not to exceed 96 square feet. Any signage less than 4 square feet is not <br />regulated, nor is signage located inside a window. The plans need to be adjusted to provide for an <br />allowable number of wall signage. <br />ATTACHMENTS <br />^ Location Map <br />^ City Planner Comment Letter dated June 28, 2011 <br />^ Response letter dated July 6, 2011 <br />^ Applicant's Narrative <br />^ Drawing packet date June 1, 2011, including <br />^ Site Plan <br />^ Architectural drawings <br />Action Motion by .Second by Vote <br />Follow Up <br />N:\Deparhnents\Community Development\Planning\Case Files\CUP\CU 11-06 The Crossing\CU 11-06 The Crossing Church SR to PC 7-12- <br />11.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.