Laserfiche WebLink
Case File: CU 11-06 The Crossing Church <br />Page 2 Conditional Use Permit <br />Building improvements will be a mixture of glass, metal siding, and precast concrete panels. There are no <br />design standards applicable to the R-4 zoning district. Photo images of the materials will be provided at <br />the meeting. <br />Rooftop units. The applicant has indicated that the roof top mechanical units would be screened from <br />public view. Due in part to the highly visable location, Staff will review line of sight drawings once <br />locations of the roof top units have been identified. <br />Parking. Parking is often the biggest concern identified during the review of an institutional use. The <br />proposed Crossing Church will provide seating for 1,500 people in the main auditorium, requiring 500 <br />parking spaces. The church proposes 547 spaces, including 25 already existing. This meets the <br />requirement. Access to the site will be via a new entrance east of the existing aparrn~ent building, and a <br />new access off of Jackson Avenue. Eventually, the access of Jackson will line up with 8~' Street. This will <br />occur when the property to the south develops. A third access is proposed, west of the building, and will <br />serve fire/emergency needs, garbage collection, and other deliveries only, no parking is provided. <br />Signage. This lot is permitted three freestanding signs; two area identification signs (8 feet high, 16 square <br />feet) and one free standing sign (96 square feet, 20 feet in height). The plans propose two area <br />identification signs, and one freestanding sign. These signs are consistent with the sign ordinance as <br />written, however, it is suggested that some attention be paid to the sign regulations, particularly its <br />definition of `development' as it appears to open up a loophole, allowing more signage than perhaps <br />intended. All signage will require a permit. Approval of the Conditional use permit is not an approval of <br />the sign package as shown. <br />Landscaping. Additional landscaping is being proposed based on the requirements of the zoning <br />ordinance. After review and minor modifications, it is staffs expectation that the landscaping plan will be <br />consistent with the landscaping requirements. This property is adjacent to a primary corridor, as <br />identified by staff and the Council. The Landscape plan has been reviewed accordingly. <br />BACKGROUND/PRECEDENT <br />Churches, classified as an Institutional Use, axe a conditional use in all residential, C-1, C-2,C-3, and DD <br />zoning districts. With the exception of the Elk River Lutheran Church approved in 2010, all of the <br />churches in Elk River are in Residential zoning districts. <br />The Crossing Church bought the former home of Alliance Church in 2009. Since then, their <br />congregation has grown, requiring an expansion. <br />N:\Departments\Community Development\Planning\Case Files\CUP\CU 11-06 The Crossing\CU 11-06 The Crossing Church SR to PC 7-12- <br />11.docx <br />