My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 07-11-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
07-11-2011
>
5.6. SR 07-11-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2011 8:33:22 AM
Creation date
7/8/2011 8:33:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/11/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Siring Tasks <br />• Sweeping <br />• Boulevard sweeping <br />• Asphalt patching <br />• Street sign maintenance <br />• Sod damage repaiurs <br />• Compost site maintenance <br />• Gravel road maintenance <br />• Roadside cleanup <br />• Tree trimming /removals <br />• Crack seal program <br />• Equipment service repairrs <br />Summer Tasks <br />• Crack seal program <br />• Storm sewer repairs <br />• Asphalt patching including <br />overlays, blade lay, cold milling & <br />potholes <br />• Street sign maintenance <br />• Administer and supervise sealcoat <br />program <br />• Paint striping program <br />• Roadside mowing <br />• Sweeping <br />• Screening materials <br />• NPDES program <br />• Concrete repairs <br />• Tree trir><uning /removals <br />• Compost site maintenance <br />• Gravel road maintenance <br />• Equipment service repairs <br />Street Division Staffing: <br />Fall Tasks <br />• Continue NPDES program <br />• Leaf sweeping <br />• Gravel road maintenance <br />• Street sign maintenance <br />• Roadside mowing <br />• Compost site maintenance <br />• Prep snow plow routes <br />• Equipment service repairs <br />Winter Tasks <br />• Snow/ice issues including, <br />plowing, sanding/salting, hauling <br />and widening <br />• Install/replace cutting edges <br />• Service and wash equipment <br />• Brining streets <br />• Mailbox repairs <br />• Pothole patching <br />• Hauling sealcoat rock <br />• Street sign maintenance <br />• Roadside tree trimming <br />• Maintain used oil drop off site <br />• Thaw frozen catch basins <br />• Spring road restriction signing <br />• Equipment service repairs <br />For clarity, the following staffing levels include analysis of the Maintenance I & II, and <br />Laborer positions. These positions and corresponding field hours account for staff that is <br />directly responsible for completing the tasks listed on the previous page. The three fleet <br />maintenance staff (Bob Steve, Terry) have been excluded from the following staffing figures. <br />Year Staffing Levels <br />Total Hours <br />2006 - 8 Maintenance I's & II's, 1 Laborer, 1 summer employee = 17,120 field hours <br />• C-vertime paid for snow plowing <br />N:\Public Bodies\Ciry Council\Council RCA\Agenda Packet\07-11-2011\Street Dept Restmcturing.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.