My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. SR 09-22-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
09/22/1997
>
5.2. SR 09-22-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:57 AM
Creation date
8/7/2003 2:16:35 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/22/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
go <br /> <br />DRAFT <br /> <br />The total inflow was calculated as the sum of the suspended load and the bed load. <br /> <br />The total annual outflow was subtracted from the total annual inflow to get the annual <br /> <br />loading. <br /> <br />The fraction of bed load depends on the characteristics of the stream bed material, texture of <br />suspended material, and the suspended sediment concentration. The bed load correction factors <br />given in Table A-3 (Design of Small Dams, Bureau of the Reclamation, Department of the <br />Interior 1987) were used to estimate the percent bed load in terms of suspended load. For <br />concentrations less than 1,000 mg/1, the table gives a bed load correction factor of 25 to <br />150 percent of suspended load for sandy stream bed material. <br /> <br />The trap efficiency of the lake was also calculated assuming different bed load concentrations <br />(Appendix D). The trap efficiency of the lake is the percent of the total sediment inflow that is <br />deposited in the lake <br /> <br />The trap efficiencies calculated were compared with Brune's trap efficiency curve (Brune, "Trap <br />Efficiency of Reservoirs" June 1953) (Appendix D). Brune's curve gives trap efficiencies of <br />normal ponded reservoirs as a function of detention time (lake volume divided by the annual <br />inflow). Lake Orono has a volume of about 1,249 acre-ft. The annual inflow rate into the lake <br />based on 1996 data is 222, 410 acre ft/yr (USGS data for Elk River near Big Lake). This gives a <br />detention time of 0.0056 years. The corresponding trap efficiency per Brune's curve is in the <br />range of 15-40 percent. This is comparable to the calculated values with bed loads of 50-100 <br />percent of suspended load. Total sediment deposition was calculated to be between 880 and <br />2,500 tons per year assuming bedload contribution in the above range. Based.on bedload at 75 <br />percent of the total suspended load, net deposition is approximately 1,700 tons, or approximately <br />1,700 cubic yards, per year in Lake Orono. Spread evenly over the lake's 254 acres, it represents <br />a deposition rate of 0.004 feet/year. This is about one fourth of the deposition rate previously <br />calculated by comparing the 1970 and 1996 DNR lake surveys. The sediment deposition is, <br /> <br />N:\0598\01 ~ELKRIVER. RPT-rlb 1 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.