PARK PROTECTS COMPLETED <br />HiEhlands West Park <br />StreetlPark and Planning Department personnel installed playground equipment, drainage, <br />cushion material, and site grading. Contractors installed the concrete perimeter curbing and the <br />bituminous parking pad. <br />Lions Park <br />• Skate park-Contractor dug out the peat for the skate park area. Street/Park <br />Department staff hauled away about 5,300 cubic yards of poor soil, hauled in about <br />6,000 cubic yards of granular fill, compacted the site and fine graded it for the concrete <br />pad. The sledding hill was re-graded in the process. <br />• Trail Lighting-StreetJPark Department staff refurbished 33 recycled streetlights from <br />Orono Parkway and mounted them to "floating" bases that were manufactured by <br />Cretex of Elk River. Staff also worked with the installing electrical contractor, helping to <br />bury conduit, and pull wire. <br />• Hockey Rink Lights-City staff assembled new light heads on recycled light poles from <br />City Hall. Staff dug, formed, and poured the concrete bases and with the help of the <br />Utilities crew, set the poles so the electrical contractor could wire them. <br />Lions Park Center <br />• Parking Lot Lights-City staff dug the base mount holes and poured the concrete for 5 <br />light poles for the parking lot at Lions Park Center, also assisting in assembling, erecting, <br />and wiring the lights. <br />• Patio-City staff installed conduits for future power and water, dug out poor quality soils, <br />and fine graded the site before the contractor poured the concrete pad. <br />Youth Athletic Complex <br />• Concession Stand-City staff dug the footings and backfilled the foundation. A contractor <br />did the building construction <br />• Fields #5 & #6-City staff established the outfield turf and installed the aglime infield <br />while a contractor constructed the fencing and backstops. <br />Baldwin Park <br />City staff built a scaled down BMX bike track. <br />Trott Brook Barn <br />StreetlPark and Planning Department personnel hung sheet rock and wood paneling. A <br />contractor re-sided the exterior. <br />Picnic Tables <br />City staff built and painted 20 new picnic tables that were placed at Lions Park Center. <br />RECYCLING <br />In April each year, the StreeUPark Department hosts a City Clean-up Day that has been very <br />successful. This effort is coordinated by the Building and Environmental Department and is <br />staffed by city workers and volunteers. Contractors collect and recycle appliances and tires. <br />Furniture that is serviceable is collected by Goodwill and the unserviceable furniture is <br />collected by local trash haulers and taken to the RDF Plant. City workers collect and process <br />the scrap metal and batteries before selling them to local scrap metal dealers. <br />