Laserfiche WebLink
S~r~E~t"~PAR~ ~fPARTPIENT <br />MISSION STATEMENT: <br />It is the mission of the StreedPark Department to provide prompt and courteous services to <br />area residents in a financially responsible manner. In doing so, we strive to be safety conscious, <br />creative, helpful, ambitious, and understanding as we do whatever tasks are laid before us. <br />YEAR IN REVIEW <br />STREET PROTECTS COMPLETED <br />Se01 CactinP <br />The annual seal coating for 2003 included the following developments: Hillside Estates 5ch <br />Addition, Ridgewood Hills, Pheasant Run, Sunset Ridge, Oak Hills I"Addition, 197`"/198`" <br />Avenue between Highway 169, and Tyler Street. Pearson Brothers Company of Maple Grove <br />was the contractor for the project. <br />Bituminous Patches and Overlay <br />The following developments had areas that were patched with paver-laid overlays by Universal <br />Paving Company (formally Elk River Bituminous, Inc.): Brentwood, Meadowvale, Ridgewood <br />East, Deerfield I & II, Fairhaven Hills, and Heavenly Hills. The Street Department prepared the <br />sites for the contractor making their operation more efficient and thus lowering the overall <br />cost. <br />Drainage Projects <br />The roadside ditch along Yankton Street, from 187'" Avenue east 250 feet, was cleaned and a <br />culvert installed under 187d' Avenue. The retention ponds along Railroad Drive west of Main <br />Street and at Highland and Jackson, were cleaned. Forty-three storm sewer outfalls and about <br />200 catch basins were inspected as part of the NPDES program. <br />Crac~lling <br />The streets that are scheduled for sealcoating in 2004 were crackfilled in October of 2003. <br />These streets include: Gates/Freeport from Main Street to Jackson, East Main Street, and Evans <br />from 193`" to 197'". <br />Miscellaneous Jobs <br />• C~ Hall/Public Safety Building StreetlPark Department staff delivered about 7,500 <br />cubic yards of sand fill far the excavating contractor at the City Hall/Public Safety <br />building site. <br />• City Hall Move: StreeUPark Department staff assisted with the move from old City Hall <br />to the temporary quarters in the Utilities office. Staff also did extensive salvage in the <br />old City Hall before the contract demolition. <br />• Street Department crews replaced bituminous curbing along 225`h Avenue from <br />Highway 169 easterly for 500 feet, along with 202nd and Ulysses in Knollwood. <br />• A contractor installed a fire protection sprinkler system in the street garage and a 6" <br />water main to supply the water. <br />• Street Department crews hauled 250 loads of dirt to stockpile at the street garage from <br />the 4`" Street project. <br />