Laserfiche WebLink
_. <br />Co issionil~~ Services -- City, of ik River <br />Systems to be Commissioned <br />..All new building mechanical systems will be conunissioned. Typical <br />'types of equipment that would be evaluated include: <br />^ Chillers, boilers, pumps, heat exchangers, air separators, expansion <br />tanks <br />^ Air handling units, rooftop units, unit ventilators <br />^ Variable air volume (VAV) boxes <br />^ Ductwork and dampers <br />^ Powered roof ventilators or exhaust fans <br />^ Carbon monoxide (CO) detection systems <br />^ Intake and exhaust hoods <br />^ Unit heaters <br />^ Building automation system and controls <br />^ Finned tube radiation heat <br />Assumptions <br />and Limitations <br />It is assumed that the design engineer will provide adequate written <br />design intent, basis of design and full sequences of operation for all <br />equipment and systems for the O & M manuals and far the <br />Commissioning Agent to use in writing verification tests. It is also <br />assumed that the contractors will execute the functional testing of <br />equipment, coordinated and documented by the Commissioning Agent, <br />using forms provided by the Commissioning Agent. <br />The review of design by the commissioning agent is intended to provide <br />a brief overview of the design with constructive comments. It is not a <br />peer review and will not necessarily include calculations or verification <br />of conformance to building codes which is the .responsibility ofthe <br />design engineer. <br />IEA is not responsible for the construction schedule or the contractor's <br />work. <br />City Of Elk River Public Works Facility Commissioning. U' IEA, Inc. 2011 <br />Proposal #1771 Page ~ <br />