My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3.B. SR 05-16-2011
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2011
>
05-16-2011
>
7.3.B. SR 05-16-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 9:56:23 AM
Creation date
5/13/2011 9:56:22 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/16/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ommissionin~ Services - ~i of Elk River <br />• Validate the test and balance report by checking {with contractor <br />assistance) 100% of the ventilation equipment which supplies <br />outdoor air to the occupants to determine that the quantities of <br />outdoor air brought into the building match the test and balance <br />report as well as the engineer's design intent for specified <br />minimum outdoor air volumes. <br />~ Approve water systems balancing by site observation, spot <br />testing and by reviewing completed balancing reports. <br />• Test each HVAC system component for conformance to all <br />control sequences listed in the specification section 23 09 93 <br />{test 20% of Terminal units). All testing to be documented and <br />included in final report. <br />Develop a commissioning punch list outlining mechanical <br />deficiencies and issue to contractors. Update and reissue punch <br />list during project as issues are resolved or new issues are <br />discovered. <br />+ Coordinate retesting as necessary until satisfactory performance <br />is achieved. <br />Issue an acceptance letter and commissioning final report to the <br />City of Elk River. <br />~ Review As-Built Drawings and Operation and Maintenance <br />manuals far accuracy. <br />Develop and submit a final commissioning report including a <br />summary ofthe how project objectives were met and details of <br />observations, testing, and results. <br />Il Month Faddow-up <br />• Perform site survey at approximately 11 months after the date of <br />substantial completion to verify that commissioning issues have <br />been resolved and systems are continuing to run as designed. <br />• Confirm that Owner's Project Requirements have been met and <br />that owner does not have unresolved concerns. <br />• Complete any seasonal testing that was not previously <br />performed. <br />• Provide 11-month follow-up report to owner. Include <br />assessment of costs and benefits of commissioning and lessons <br />learned. <br />City Qf Elk River Public Works Facility Commissioning ©IEA, inc. 2~l l <br />Proposal #1771 Page 6 <br />