My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 05-10-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2011
>
05-10-2011
>
6.1. ERMUSR 05-10-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2012 2:52:35 PM
Creation date
5/10/2011 11:55:39 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/10/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River.; <br />Municipal Utilities <br />13069 Orono Parkway phone: 763.441.2020 <br />Elk River, MN 55330 Fax: 763.441.8099 <br />UTILITIES COMMISSION MEETING <br />TO: FROM: <br />Elk River Municipal Utilities Commission Mark Fuchs <br />John Dietz, Chair Line Superintendent <br />Daryl Thompson, Vice Chair <br />A1Ian Nadeau, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Ma 10, 20] 1 6.1 <br />SUBJECT: <br />Staff Updates <br />Discussion: <br />• Continue working on changing out our overhead cutouts and fuses. With this we go thru <br />checking pad mount transformers and pad mount switch gear making sure nothing is <br />leaking, the proper tags are in place, the map book matches the tags and all the warning <br />stickers aze on the outside. <br />• Finished up tree trimming. <br />• Found some connections that were starting to heat up at the Station 14 Bank 3 Substation. <br />We found these with the infra red camera. <br />• Spliced out the three phase primary wire and removed a three phase junction box that had <br />rusted out by The Crossing Church. <br />• Working on finishing up Engers addition rebuild. We had to stop the project due to the <br />frost last fall. <br />• Working on replacing some street lights that got damaged this winter and needed to be <br />replaced. Also had a secondazy pedestal that was damaged that needed to be moved and <br />replaced. <br />• Finished installing a pad mount transformer and removed two overhead transformer <br />banks at Cretex. This job was also started last fall. <br />• I am going to an APPA course in Austin, Texas the first week of May. This course was <br />on constructing, operating, and maintaining underground distribution systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.