Laserfiche WebLink
Elk River.; <br />Municipal Utilities <br />13069 Orono Parkway phone: 763.441.2020 <br />Elk River, MN 55330 Fax: 763.441.8099 <br />UTILITIES COMMISSION MEETING <br />TO: FROM: <br />Elk River Municipal Utilities Commission Mark Fuchs <br />John Dietz, Chair Line Superintendent <br />Daryl Thompson, Vice Chair <br />A1Ian Nadeau, Trustee <br />MEETING DATE: AGENDA ITEM NUMBER: <br />Ma 10, 20] 1 6.1 <br />SUBJECT: <br />Staff Updates <br />Discussion: <br />• Continue working on changing out our overhead cutouts and fuses. With this we go thru <br />checking pad mount transformers and pad mount switch gear making sure nothing is <br />leaking, the proper tags are in place, the map book matches the tags and all the warning <br />stickers aze on the outside. <br />• Finished up tree trimming. <br />• Found some connections that were starting to heat up at the Station 14 Bank 3 Substation. <br />We found these with the infra red camera. <br />• Spliced out the three phase primary wire and removed a three phase junction box that had <br />rusted out by The Crossing Church. <br />• Working on finishing up Engers addition rebuild. We had to stop the project due to the <br />frost last fall. <br />• Working on replacing some street lights that got damaged this winter and needed to be <br />replaced. Also had a secondazy pedestal that was damaged that needed to be moved and <br />replaced. <br />• Finished installing a pad mount transformer and removed two overhead transformer <br />banks at Cretex. This job was also started last fall. <br />• I am going to an APPA course in Austin, Texas the first week of May. This course was <br />on constructing, operating, and maintaining underground distribution systems. <br />